GS11935 GS11934 RVPA-46 Promoting sustainable use of biomass energy resources in targeted communities
GS-4722 ↗ · current registry ID: GS12746
#682of 1329 in Industrial#74of 101 in Nepal#1031of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove efficiency project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but significant gaps in permanence safeguards (no buffer pool, reversals unaddressed), an unverified 100% usage-rate assumption, and a contradictory FPIC record. The identical claimed and verified ERR figures suggest no independent monitoring verification has yet been conducted, limiting confidence in the credit volume.
Red Flags
- FPIC status is contradictory: the 2024 validation report states FPIC was not conducted, while an earlier 2023 validation report states it was — the more recent document is privileged, indicating a potential safeguards gap
- 100% usage rate assumed with no verified usage-rate data available, creating material over-crediting risk
- Total ERR claimed and verified are identical (47,333 tCO2e), indicating no independent monitoring verification has been performed
- No buffer pool percentage stated and reversal events explicitly not addressed, leaving permanence risk unmitigated
- Low extraction confidence across the document set reduces reliability of the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 2,144 | 0 | 2,144 | |
| 2024 | 2,323 | 0 | 2,323 | |
| Total | 4,467 | 0 | 4,467 |
Risk Indicators
VVB-confirmed combined test
reversals unaddressed
5% quantified deduction with justification
Project-specific; no reassessment date found
FPIC contradictory; grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →