Skip to main content
GSEnergy Efficiency - DomesticNepalGeneral Methodologyv2.1

GS11935 GS11934 RVPA-53 Promoting sustainable use of biomass energy resources in targeted communities

GS-4729 ↗ · current registry ID: GS12753

#512of 1329 in Industrial#53of 101 in Nepal#810of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
4.5
Documentation
5.0

Audit Analysis

A Gold Standard cookstove project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but significant gaps in permanence protection (no buffer pool, reversal risk unaddressed), an aggressive 100% usage-rate assumption, and contradictory FPIC documentation. The project is very new (crediting period began November 2023) with no monitoring data yet, and the low extraction confidence in the source documents limits assurance.

Red Flags

  • 100% usage rate assumed in the validation report with no verified usage data to support it; the appendix contains a contradictory value of 1, creating ambiguity about the true assumption
  • No buffer pool percentage stated and reversal events explicitly 'not addressed' — permanence risk for cookstove credits is unmitigated
  • FPIC status is contradictory: the 2024 validation report states it was not conducted, while an earlier 2023 validation report states it was conducted
  • Total ERR claimed and verified are identical (48,709 tCO2e), suggesting the 'verification' confirmed the ex-ante calculation rather than independent monitoring
  • Low extraction confidence across the document set, with one document of unknown type in the evidence list

Credit Vintages

IssuedRetiredAvailable
2023
9280928
2024
2,41302,413
Total3,34103,341

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal unaddressed

Leakage

5% quantified deduction

Baseline

Project-specific; reassessment date not stated

Safeguards

FPIC contradictory; grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents