GS12239 GS12240 RVPA-1 Amazi Meza Rwanda Water Supply Project For Schools
GS-4860 ↗ · current registry ID: GS23187
#826of 1329 in Industrial#61of 139 in Rwanda#1225of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard water-supply project for schools in Rwanda with VVB-confirmed additionality and documented safeguards, but significant gaps in quantified emission data, permanence provisions, and leakage treatment. The 100% usage-rate assumption and absence of any verified ERR figures limit confidence in the claimed reductions. Low extraction confidence and the absence of a monitoring report further constrain the assessment.
Red Flags
- Usage rate assumed at 100% with no verified usage data in any available document, creating over-crediting risk
- No buffer pool percentage stated and reversal events explicitly not addressed, leaving permanence risk unquantified
- Leakage treatment entirely absent from the extracted record — no deduction, no justification
- Total ERR claimed and verified are both absent from all available documents, preventing any over/under-delivery check
- Minimum extraction confidence rated low, indicating at least one key document was poorly readable
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 13,447 | 0 | 13,447 | |
| 2025 | 4,311 | 0 | 4,311 | |
| Total | 17,758 | 0 | 17,758 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
Not addressed; no deduction or justification
Project-specific; reassessment date not stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →