GS1247 VPA 125 Zoba Anseba Community Safe Water
Score Breakdown
Integrity
verified The verification report from SustainCERT confirms additionality, and the report records no material findings or corrective actions.
missing Reversal risk is not addressed, and no buffer pool percentage was found in the available documents.
Transparency
verified The monitoring period is clearly stated, and the verification report identifies the VVB and the monitoring approach using annual surveys.
inferred The extracted record does not include claimed or verified ERR totals, and CORSIA eligibility is not stated.
Claim Safety
verified Leakage is treated with a quantified deduction of 0%, and the usage rate was verified at 95% versus a 90% assumption.
missing The baseline is project-specific rather than clearly standardized, which leaves more room for over-crediting risk than a jurisdictional baseline would.
Documentation
verified The record draws on four evidence documents, including the PDD, monitoring report, and verification report, with high extraction confidence.
verified The crediting period and monitoring period are both stated, and the verification report is dated 2023-07-28.
Detailed Analysis
Integrity
The verification report from SustainCERT confirms additionality, and the project reports no material findings or corrective actions, which supports a solid integrity score. Leakage is quantified at 0%, and the usage rate was verified at 95% against a 90% assumption, which is favorable. However, reversal risk is not addressed and no buffer pool information was found, so permanence is weaker than ideal.
Transparency
The documentation identifies the Gold Standard registry, the monitoring period from 2021-12-01 to 2022-11-30, and the VVB, which helps transparency. The monitoring method is described as annual surveys, but the extracted record does not provide claimed or verified ERR totals, limiting public accounting clarity. CORSIA eligibility is not stated in the available documents, so claim visibility is incomplete.
Claim Safety
Claim safety is supported by VVB-confirmed additionality, quantified leakage treatment, and a verified usage rate that is higher than the assumed rate. The project uses a project baseline, and the extracted record does not show a recent baseline reassessment, which leaves some over-crediting risk. The national default FNRB value is 0.97, but the record does not provide a comparison against an alternative benchmark or a detailed justification for why the chosen baseline is conservative enough.
Documentation
Documentation quality is fairly strong because the record draws on four evidence documents and the extraction confidence is high. The crediting period and monitoring period are both available, and the verification report is dated 2023-07-28, which is reasonably recent relative to the monitoring period. Some claim-related fields remain unstated in the extracted record, including CORSIA eligibility and CCP status, which prevents a perfect documentation score.
Overall
There are no contradictions listed in the extracted record, so no conflict-resolution penalty is needed. The strongest evidence comes from the verification report, which I privileged for additionality, findings, and monitoring credibility because it is the independent assurance document. Overall, the project looks credible but not top-tier because permanence is under-documented and some registry/claim fields are not fully specified.
Audit Analysis
This is a reasonably well-documented Gold Standard safe water project with VVB-confirmed additionality, quantified leakage treatment, and no material findings in the verification report. The main weaknesses are that reversal risk is not addressed, the baseline is project-specific rather than clearly standardized, and some registry/claim fields are not fully stated in the extracted record.
Project Description
Developer: CO2balance UK ltd Type: Energy Efficiency - Domestic Size: Micro Scale Crediting period: 2017-11-12 → 2024-11-11 Estimated annual credits: 10000 tCO2e SDGs: Goal 13: Climate Action, Goal 6: Clean Water and Sanitation, Goal 3: Good Health and Well-Being
Red Flags
- Reversal risk is not addressed and no buffer pool information was found.
- The project uses a project baseline and the extracted record does not show a recent baseline reassessment.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 1,038 | 1,038 | 0 | |
| 2018 | 9,807 | 9,807 | 0 | |
| 2019 | 9,433 | 9,431 | 2 | |
| 2020 | 4,814 | 4,654 | 160 | |
| 2021 | 4,916 | 3,401 | 1,515 | |
| 2022 | 4,552 | 225 | 4,327 | |
| 2023 | 3,745 | 0 | 3,745 | |
| 2024 | 3,248 | 0 | 3,248 | |
| Total | 41,553 | 28,556 | 12,997 |
Cosa migliorerebbe questo punteggio
- Provide explicit reversal-risk treatment, including buffer pool coverage or a clear justification that reversals are not relevant.
- Disclose claimed and verified emission reductions, plus a clearer baseline reassessment history and registry/claim status.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No buffer or reversal treatment stated
Leakage quantified at 0%
Project baseline without reassessment date
FPIC and grievance mechanism documented
CORSIA/CCP status not fully stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- GS5951-55 6041-42_ERs_calcs_v4(1).xlsx
- GS5951-55 6041-42_ERs_calcs_v2(7).xlsx
- PoA GS1247 Annual-Report - signed.pdf
- GS5951-55_GS6041-42_Anseba-BHs Annual-Report 2022(3).pdf
- (1)Monitoring Report_1st monitoring period_31.10.2017 to 30.11.2018_v4.pdf
- GS5951-55_GS6041-42_MR_MP5-MP3_v2_CLEAN(7).pdf
- +4 more
pdd
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →