Skip to main content
GSEnergy Efficiency - DomesticEthiopiaGeneral Methodologyv2.1

GS1247 VPA 128 Southern Ethiopia Community Boreholes

GS-1052 ↗ · current registry ID: GS6038

#685of 1329 in Industrial#14of 36 in Ethiopia#1035of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.5
Documentation
4.0

Audit Analysis

This Gold Standard VPA under a multi-technology PoA (community boreholes in Southern Ethiopia) has VVB-confirmed additionality and no reversal events, but is undermined by nine cross-document contradictions, a 0% leakage deduction that conflicts with the PDD's 5% figure, a massive ERR discrepancy between the monitoring and verification reports, and a long list of unresolved corrective actions and open findings. The low extraction confidence and an 'unknown' document type further erode confidence in the data record.

Red Flags

  • ERR discrepancy: the monitoring report (Feb 2023) claims 21,874 tCO₂e while the verification report (Jun 2026) reports 2,266 tCO₂e for the same monitoring period — a ~10× gap that is unexplained in the extracted record
  • Nine contradictions across documents on leakage, fNRB method, usage rate, additionality type, crediting period, and benefit sharing, indicating inconsistent or conflated data across the PoA's multiple VPA components
  • Extensive list of open corrective actions and five open Findings and Recommendations (FAR 01–05) at the VPA level, including unresolved SDG indicator evaluation and fNRB reporting
  • Operational concerns: water volume decline in dry seasons, queues up to 3 hours, and seasonal variation not yet captured in the monitoring survey format
  • min_extraction_confidence is 'low' and one evidence document is typed as 'unknown', reducing reliability of the extracted data

Credit Vintages

IssuedRetiredAvailable
2017
4,9474,9470
2018
10,0009,878122
2019
4,6624,6620
2020
5,0122,8892,123
2021
2,9182,88830
2022
1,9904471,543
2023
4560456
Total29,98525,7114,274

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction conflicts with PDD 5%

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents