Skip to main content
GSEnergy Efficiency - DomesticEthiopiaGeneral Methodologyv2.1

GS1247 VPA 149 Southern Ethiopia Community Safe Water

GS-1449 ↗ · current registry ID: GS6783

#1057of 1329 in Industrial#26of 36 in Ethiopia#1499of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.0
Documentation
4.0

Audit Analysis

This Gold Standard safe-water project in Southern Ethiopia has a VVB-verified combined additionality test and no reported reversal events, but is weighed down by an extensive backlog of corrective and forward action requests, a project-specific baseline, a 0% leakage deduction that contradicts an earlier 5% figure in the PDD, and a significant discrepancy in claimed emission reductions across monitoring reports (3,670 vs 31,670 tCO2e). The low extraction confidence and the absence of a buffer pool further erode confidence in the project's long-term integrity and data reliability.

Red Flags

  • Claimed emission reductions differ by nearly 10× between the 2023 monitoring report (31,670 tCO2e) and the 2026 verification report (3,670 tCO2e); the basis for each figure is not clearly reconciled in the extracted record.
  • Eleven Corrective Action Requests and eleven Clarification Requests were raised and resolved, and at least five Forward Action Requests remain open as of the 2026 verification, indicating persistent documentation and methodology gaps.
  • No on-site inspection was conducted for the 2023 verification due to COVID-19; a remote audit was performed instead, limiting the depth of field-level verification.
  • Leakage deduction was reduced from 5% in the PDD (2023) to 0% in the 2026 verification, with the justification shifting from a quantified deduction to a claim that displaced technologies have no market value.

Credit Vintages

IssuedRetiredAvailable
2017
1,5411,5410
2018
10,00010,0000
2019
5,1115,1110
2020
7,0732,6224,451
2021
4,8514,8501
2022
2,82502,825
2023
5840584
Total31,98524,1247,861

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification contested across docs

Baseline

Project-specific baseline, reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents