GS1247 VPA 149 Southern Ethiopia Community Safe Water
GS-1449 ↗ · current registry ID: GS6783
#1057of 1329 in Industrial#26of 36 in Ethiopia#1499of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe-water project in Southern Ethiopia has a VVB-verified combined additionality test and no reported reversal events, but is weighed down by an extensive backlog of corrective and forward action requests, a project-specific baseline, a 0% leakage deduction that contradicts an earlier 5% figure in the PDD, and a significant discrepancy in claimed emission reductions across monitoring reports (3,670 vs 31,670 tCO2e). The low extraction confidence and the absence of a buffer pool further erode confidence in the project's long-term integrity and data reliability.
Red Flags
- Claimed emission reductions differ by nearly 10× between the 2023 monitoring report (31,670 tCO2e) and the 2026 verification report (3,670 tCO2e); the basis for each figure is not clearly reconciled in the extracted record.
- Eleven Corrective Action Requests and eleven Clarification Requests were raised and resolved, and at least five Forward Action Requests remain open as of the 2026 verification, indicating persistent documentation and methodology gaps.
- No on-site inspection was conducted for the 2023 verification due to COVID-19; a remote audit was performed instead, limiting the depth of field-level verification.
- Leakage deduction was reduced from 5% in the PDD (2023) to 0% in the 2026 verification, with the justification shifting from a quantified deduction to a claim that displaced technologies have no market value.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 1,541 | 1,541 | 0 | |
| 2018 | 10,000 | 10,000 | 0 | |
| 2019 | 5,111 | 5,111 | 0 | |
| 2020 | 7,073 | 2,622 | 4,451 | |
| 2021 | 4,851 | 4,850 | 1 | |
| 2022 | 2,825 | 0 | 2,825 | |
| 2023 | 584 | 0 | 584 | |
| Total | 31,985 | 24,124 | 7,861 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, justification contested across docs
Project-specific baseline, reassessed 2024
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →