GS1247 VPA 164 EcoZoom Improved Stove Programme, Uganda
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project uses a combined additionality test in the validation report.
missing Leakage is not addressed in the latest validation record, and no buffer pool percentage is stated; reversal treatment is also not addressed.
Transparency
verified The monitoring period, VVB name, and usage monitoring approach are stated in the validation record, and safeguards are mentioned.
missing Total ERs claimed and verified are not stated, and low extraction confidence suggests at least one key document was difficult to read.
Claim Safety
verified The baseline was reassessed in 2024, which is better than an outdated or missing baseline review.
missing The latest record shows a leakage deduction of 0% with no justification, while an earlier document reportedly quantified leakage; usage assumptions also differ across documents.
Documentation
verified The record includes many extracted fields, a named VVB, and multiple documents were used.
missing Extraction confidence is low, and the contradiction list shows several unresolved conflicts, including the crediting period and usage-related inputs.
Detailed Analysis
Integrity
The validation report confirms additionality through a combined test and says the VVB verified it, which supports the project’s core integrity case. The baseline was last reassessed in 2024, but leakage is listed as not addressed and no buffer pool percentage is provided, which weakens permanence and over-crediting protection. Reversal events are also not addressed in the latest record, so the non-reversal case is not well documented.
Transparency
The validation record identifies the VVB, monitoring period, and annual survey-based usage monitoring, which helps traceability. However, total ERs claimed and verified are not stated in the extracted record, and the low extraction confidence indicates at least one source was poorly readable. That combination limits confidence in the completeness of the public MRV trail.
Claim Safety
Claim safety is mixed because the project has a recent baseline reassessment and a verified additionality test, but the latest record shows a leakage deduction of 0% with no justification. The contradiction list also shows earlier documents reportedly used a quantified leakage treatment, a different usage rate, and a different usage monitoring method, which raises over-crediting risk. The FNRB method is also inconsistent across documents, so the conservative reading is that the emissions claim is not fully robustly supported.
Documentation
Documentation is only moderate because the record contains many extracted fields, a named VVB, and multiple documents were used. Still, the extraction confidence is low, and the contradiction list includes several material conflicts on FNRB method, benefit sharing, leakage justification, usage rate, usage monitoring, reversal events, and crediting period. Those inconsistencies reduce confidence in the completeness and reliability of the document set.
Overall
I privileged the latest validation report dated 2025-08-18 for fields where it conflicts with older documents, because it is the most recent and appears to be the highest-level synthesis available. That means I treated leakage as not addressed, benefit sharing as described, annual survey monitoring as current, and the 2025-05-01 to 2030-04-30 crediting period as the operative one, while noting that earlier documents reported different values. The contradictions materially reduce reliability, so the score is held below what the positive additionality and safeguard signals alone would suggest.
Audit Analysis
The project has some strengths, including VVB-confirmed additionality, recent baseline reassessment, and documented safeguards such as FPIC and a grievance mechanism. However, reliability is weakened by low extraction confidence, unresolved leakage treatment, missing buffer pool and reversal detail, and several contradictions across documents that reduce confidence in the claimed emissions reductions.
Project Description
Developer: BioLite, Inc. Type: Energy Efficiency - Domestic Size: Micro Scale Crediting period: 2017-11-21 → 2024-11-20 Estimated annual credits: 9998 tCO2e SDGs: Goal 13: Climate Action, Goal 3: Good Health and Well-Being, Goal 7: Affordable and Clean Energy
Red Flags
- Leakage is marked as not addressed in the latest validation record, despite an earlier document reportedly quantifying it.
- No buffer pool percentage or clear reversal treatment is stated, and the latest record says reversal events are not addressed.
- Multiple contradictions exist on FNRB method, benefit sharing, usage rate, usage monitoring method, and crediting period.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 9 | 9 | 0 | |
| 2018 | 9,258 | 9,131 | 127 | |
| 2019 | 9,972 | 9,915 | 57 | |
| 2020 | 9,908 | 9,737 | 171 | |
| 2021 | 9,681 | 9,681 | 0 | |
| 2022 | 9,575 | 3,183 | 6,392 | |
| 2023 | 5,531 | 0 | 5,531 | |
| Total | 53,934 | 41,656 | 12,278 |
Cosa migliorerebbe questo punteggio
- Provide a clear, document-backed leakage assessment and explain why a 0% deduction is justified, or restore the quantified leakage treatment from earlier records if applicable.
- Publish a complete reconciliation of the contradictory values, including FNRB method, usage rate, usage monitoring method, reversal treatment, and crediting period, with a single authoritative source.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed combined test
No buffer pool or reversal treatment stated
Leakage not addressed in latest record
Project baseline with recent reassessment
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- Monitoring Report_1st monitoring period_18.09.2018 to 30.09.2020_v3.pdf
- VPA 164 - Monitoring Report - MP3_EcoZoom Improved Stove Programme Uganda (GS 7153) - v3.0(2).docx
- VPA 164 - Monitoring Report - MP2_EcoZoom Improved Stove Programme Uganda (GS 7153) - Ver 5.0_Final Clean.pdf
- VPA 164 - Summary of SDG outcomes_MP2-Version 3.0.xlsx
- PoA GS1247 Annual-Report - signed.pdf
- BioLite GS VER calculator_VPA164 Uganda_MP3(1).xlsx
pdd
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →