Skip to main content
GSEnergy Efficiency - DomesticZambiaGeneral Methodologyv2.1

GS1247 VPA 197 Zambia Eastern Province Safe Water Project

GS-1826 ↗ · current registry ID: GS7463

#526of 1329 in Industrial#11of 33 in Zambia#824of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

The Zambia Eastern Province Safe Water Project (VPA 197 under Gold Standard) has VVB-verified additionality and a quantified 5% leakage deduction, but suffers from a project-specific baseline, no stated buffer pool, and a complete absence of a verified ERR figure to benchmark against the 9,414 claimed. Multiple contradictions across documents and five open follow-up actions from the verification body indicate the project design has not yet been fully consolidated.

Red Flags

  • No verified ERR figure is available in any document; the 9,414 claimed ERR cannot be independently confirmed for the 2024 monitoring period
  • Five follow-up actions (FAR 01–05) remain open, including the requirement to submit an fNRB report at VPA level and justify monitoring options
  • Contradictions in leakage treatment (quantified 5% vs. deemed negligible) and fNRB method (local field vs. national default) across documents of the same vintage raise data-reliability concerns

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

technology replacement risk

Leakage

5% quantified deduction

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents