Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

GS1247 VPA 2 Improved Kitchen Regimes: Kole District Borehole Project, Uganda

GS-214 ↗ · current registry ID: GS1359

#527of 1329 in Industrial#64of 163 in Uganda#825of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
5.0
Documentation
5.5

Audit Analysis

A multi-VPA borehole project in Uganda displacing firewood/charcoal for water heating, with VVB-confirmed additionality and no reversal events, but undermined by extensive calculation inconsistencies, water quality failures (three boreholes removed from crediting), a weak 0% leakage justification, and contradictory ERR figures across documents that prevent a reliable claimed-versus-verified comparison.

Red Flags

  • ERR figures are contradictory: the validation report (2025-12-18) states a claimed total of 952 tCO2e while the verification report (2025-01-07) reports 10,746 tCO2e verified; the lifetime ex-ante estimate is absent, making a pro-rata over/under-delivery check impossible
  • Three boreholes (Anotocao, Te-Dam, Bua Yubu) were removed from crediting for failing national water quality standards, and 2,064 failure days were recorded across all boreholes during the monitoring period, raising operational-reliability concerns
  • Leakage deduction is 0% with only a 'deemed negligible' justification, despite the project type (displacing firewood for water heating) carrying a realistic risk of households reverting to biomass fuels
  • The PDD (2023) originally specified a 5% leakage deduction, which was later reduced to 0% in the 2025 verification report without a clearly documented methodological change
  • FPIC status is contradictory: the 2024 monitoring report states it was not conducted, while the 2025 validation report states it was conducted; the more recent validation report is privileged but the discrepancy is unresolved

Credit Vintages

IssuedRetiredAvailable
2013
6,7126,7120
2014
9,9559,9550
2015
10,00010,0000
2016
10,04110,0410
2017
10,00010,0000
2018
10,00010,0000
2019
6,5336,5330
2020
3,0503,0500
2021
2,9985172,481
2022
2,7912,73457
2023
2,4312,166265
2024
1,25401,254
Total75,76571,7084,057

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Energy efficiency; no reversal events

Leakage

0% deduction; weak justification

Baseline

Project-specific; reassessed 2024

Safeguards

Grievance present; FPIC contradictory

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents