GS1247 VPA 205 Sierra Leone Safe Water
GS-1863 ↗ · current registry ID: GS7477
#613of 1329 in Industrial#6of 16 in Sierra Leone#939of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe water project in Sierra Leone displaces thermal energy used for boiling water, with additionality confirmed by SustainCERT via a combined test. However, the project suffers from significant operational instability (4,193 non-functional borehole days, declining usage rates), a 0% leakage deduction with contradictory justifications across documents, no buffer pool, and an ongoing Gold Standard grievance review imposing temporary caps. The verified emissions reductions (86,933 tCO2e) represent only about 43% of the pro-rata ex-ante expectation for the two-year monitoring period, indicating substantial under-delivery that, while protective against over-crediting, raises serious questions about long-term project viability.
Red Flags
- 4,193 non-functional borehole days across all VPAs during the monitoring period due to low water discharge and broken pump heads, with no exit strategy in place
- 0% leakage deduction justified as 'quantified' in the verification report but 'deemed negligible' in the monitoring report, while the PDD originally specified a 5% deduction — the justification is inconsistent across documents
- Ongoing Gold Standard grievance review imposing temporary caps (300 users per borehole, 0.0004 T/L for Wb,y/Wp,y) that constrain credit generation and signal unresolved compliance issues
- Usage rate declined from 93.98% to 81.73% between monitoring periods, indicating deteriorating project performance
- Five open Findings and Recommendations (FAR 01–05) remain unaddressed, including VPA-level SDG indicator evaluation and fNRB reporting
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 2,796 | 2,796 | 0 | |
| 2020 | 6,774 | 6,774 | 0 | |
| 2021 | 6,980 | 6,980 | 0 | |
| 2022 | 5,536 | 2,067 | 3,469 | |
| 2023 | 2,080 | 0 | 2,080 | |
| Total | 24,166 | 18,617 | 5,549 |
Risk Indicators
VVB-confirmed combined test
4,193 failure days; no exit strategy
0% deduction with contradictory justifications across documents
Project-specific baseline; reassessed 2024; not jurisdictional
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →