GS1247 VPA 205 Sierra Leone Safe Water

GS-1863 ↗ · current registry ID: GS7477

#613of 1329 in Industrial#6of 16 in Sierra Leone#939of 1801 in Gold Standard (GS)

4.9/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

This Gold Standard safe water project in Sierra Leone displaces thermal energy used for boiling water, with additionality confirmed by SustainCERT via a combined test. However, the project suffers from significant operational instability (4,193 non-functional borehole days, declining usage rates), a 0% leakage deduction with contradictory justifications across documents, no buffer pool, and an ongoing Gold Standard grievance review imposing temporary caps. The verified emissions reductions (86,933 tCO2e) represent only about 43% of the pro-rata ex-ante expectation for the two-year monitoring period, indicating substantial under-delivery that, while protective against over-crediting, raises serious questions about long-term project viability.

Red Flags

  • 4,193 non-functional borehole days across all VPAs during the monitoring period due to low water discharge and broken pump heads, with no exit strategy in place
  • 0% leakage deduction justified as 'quantified' in the verification report but 'deemed negligible' in the monitoring report, while the PDD originally specified a 5% deduction — the justification is inconsistent across documents
  • Ongoing Gold Standard grievance review imposing temporary caps (300 users per borehole, 0.0004 T/L for Wb,y/Wp,y) that constrain credit generation and signal unresolved compliance issues
  • Usage rate declined from 93.98% to 81.73% between monitoring periods, indicating deteriorating project performance
  • Five open Findings and Recommendations (FAR 01–05) remain unaddressed, including VPA-level SDG indicator evaluation and fNRB reporting

Credit Vintages

IssuedRetiredAvailable
2019
2,7962,7960
2020
6,7746,7740
2021
6,9806,9800
2022
5,5362,0673,469
2023
2,08002,080
Total24,16618,6175,549

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

4,193 failure days; no exit strategy

Leakage

0% deduction with contradictory justifications across documents

Baseline

Project-specific baseline; reassessed 2024; not jurisdictional

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents