GS1247 VPA 207 Sierra Leone Safe Water
GS-1865 ↗ · current registry ID: GS7479
#767of 1329 in Industrial#13of 16 in Sierra Leone#1155of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe-water project in Sierra Leone has VVB-verified additionality and no reversal events, but is undermined by a significant under-delivery of emissions reductions relative to ex-ante estimates, a 0% leakage deduction with contradictory justifications across documents, the absence of any buffer pool or permanence mechanism, and an extensive list of open corrective actions and grievance-related parameter caps. The project's claim safety is further weakened by a project-specific baseline and reliance on annual surveys rather than continuous monitoring.
Red Flags
- Achieved ERs (25,442 tCO2e) are substantially below ex-ante estimates of 100,000 tCO2e/year, indicating significant under-delivery flagged in the verification report
- No buffer pool or permanence mechanism is identified in any available document, leaving no safeguard against potential reversal
- Leakage deduction is 0% with contradictory justifications: the verification report (2024) states 'quantified' while the monitoring report (2024) states 'deemed negligible', and the PDD originally proposed a 5% deduction
- Multiple temporary parameter caps (firewood consumption, users per borehole, water quality ratio) were imposed by GS-TAC during ongoing grievance reviews, indicating unresolved operational issues
- Extensive list of open corrective actions and findings, including lack of exit strategy, reduced water yield at 4 facilities, and women's participation challenges
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 2,176 | 2,176 | 0 | |
| 2020 | 6,774 | 6,774 | 0 | |
| 2021 | 5,930 | 5,888 | 42 | |
| 2022 | 6,142 | 2,067 | 4,075 | |
| 2023 | 2,451 | 0 | 2,451 | |
| Total | 23,473 | 16,905 | 6,568 |
Risk Indicators
Combined test, VVB-verified
no reversals
0% deduction, contradictory justification
Project-specific, reassessed 2024
FPIC, grievance, benefit sharing
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →