Skip to main content
GSEnergy Efficiency - DomesticSierra LeoneGeneral Methodologyv2.1

GS1247 VPA 207 Sierra Leone Safe Water

GS-1865 ↗ · current registry ID: GS7479

#767of 1329 in Industrial#13of 16 in Sierra Leone#1155of 1801 in Gold Standard (GS)

4.7/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.0
Documentation
5.5

Audit Analysis

This Gold Standard safe-water project in Sierra Leone has VVB-verified additionality and no reversal events, but is undermined by a significant under-delivery of emissions reductions relative to ex-ante estimates, a 0% leakage deduction with contradictory justifications across documents, the absence of any buffer pool or permanence mechanism, and an extensive list of open corrective actions and grievance-related parameter caps. The project's claim safety is further weakened by a project-specific baseline and reliance on annual surveys rather than continuous monitoring.

Red Flags

  • Achieved ERs (25,442 tCO2e) are substantially below ex-ante estimates of 100,000 tCO2e/year, indicating significant under-delivery flagged in the verification report
  • No buffer pool or permanence mechanism is identified in any available document, leaving no safeguard against potential reversal
  • Leakage deduction is 0% with contradictory justifications: the verification report (2024) states 'quantified' while the monitoring report (2024) states 'deemed negligible', and the PDD originally proposed a 5% deduction
  • Multiple temporary parameter caps (firewood consumption, users per borehole, water quality ratio) were imposed by GS-TAC during ongoing grievance reviews, indicating unresolved operational issues
  • Extensive list of open corrective actions and findings, including lack of exit strategy, reduced water yield at 4 facilities, and women's participation challenges

Credit Vintages

IssuedRetiredAvailable
2019
2,1762,1760
2020
6,7746,7740
2021
5,9305,88842
2022
6,1422,0674,075
2023
2,45102,451
Total23,47316,9056,568

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

no reversals

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance, benefit sharing

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents