Skip to main content
GSEnergy Efficiency - DomesticSierra LeoneGeneral Methodologyv2.1

GS1247 VPA 208 Sierra Leone Safe Water

GS-1866 ↗ · current registry ID: GS7480

#880of 1329 in Industrial#14of 16 in Sierra Leone#1296of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
3.5
Transparency
5.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

This Gold Standard safe water project in Sierra Leone displaces thermal energy (firewood/charcoal) used for water heating via boreholes. While additionality is VVB-confirmed and no reversal events occurred, the project carries an extraordinary volume of material findings (over 60) and open corrective actions (over 50), including 4,193 borehole failure days, a usage rate decline from 94% to 82%, and a reduction of the leakage deduction from 5% (PDD) to 0% (verification report). These operational and documentation issues significantly undermine confidence in the integrity and robustness of the claimed reductions.

Red Flags

  • Over 60 material findings and 50+ open corrective actions reported across verification and monitoring documents, indicating systemic documentation and implementation weaknesses
  • Leakage deduction reduced from 5% in the PDD to 0% in the 2024 verification report, with justification described only as 'quantified' without visible quantification in the extracted record
  • 4,193 borehole failure days during the 2023–2024 monitoring period and a usage rate decline from 93.98% to 81.73% signal significant operational fragility
  • Emission reductions were capped at 10,000 tCO2e per VPA due to a Gold Standard grievance review, and temporary caps on users per borehole and fuel consumption were applied
  • Lack of an exit strategy for beneficiaries was flagged as a risk in the verification report

Credit Vintages

IssuedRetiredAvailable
2019
96487490
2020
6,1976,1970
2021
6,9266,9260
2022
5,7822,0673,715
2023
2,23102,231
Total22,10016,0646,036

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

4,193 failure days

Leakage

0% deduction, down from 5% in PDD

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents