Skip to main content
GSEnergy Efficiency - DomesticSierra LeoneGeneral Methodologyv2.1

GS1247 VPA 210 Sierra Leone Safe Water

GS-1868 ↗ · current registry ID: GS7482

#692of 1329 in Industrial#10of 16 in Sierra Leone#1042of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.0
Transparency
5.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

A Gold Standard safe-water (borehole) project in Sierra Leone with VVB-confirmed additionality and no reversal events, but undermined by the absence of a buffer pool, a 0% leakage deduction that contradicts the PDD's 5% figure, a declining usage rate, retired boreholes, and extensive corrective actions and Gold Standard grievance-review caps that signal operational and crediting-integrity concerns. The verified ERR for the current monitoring period (18,707 tCO2e) is far below the ex-ante annual estimate of 100,000 tCO2e cited in the material findings, indicating significant under-delivery relative to the original design assumptions.

Red Flags

  • No buffer pool is recorded in any available document, leaving no financial backstop against potential reversal of avoided emissions.
  • Leakage deduction was reduced from 5% in the PDD (2023) to 0% 'deemed negligible' in the 2026 verification report without a quantified re-analysis.
  • Gold Standard applied grievance-review caps (300 users per borehole, 0.0004 T/L fuel parameter) that reduced verified emissions reductions, indicating the project was initially over-crediting.
  • Usage rate fell from 93.98% to 81.73% between monitoring periods, and two boreholes were retired, eroding the project's operational base.
  • The material findings note a 'lack of exit strategy poses risks to beneficiaries,' a governance gap that threatens long-term project integrity.

Credit Vintages

IssuedRetiredAvailable
2019
6246240
2020
6,7716,68982
2021
6,9586,641317
2022
6,5152,2264,289
2023
2,57802,578
Total23,44616,1807,266

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals but operational risk

Leakage

0% deemed negligible; PDD had 5%

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents