GS1247 VPA 211 Sierra Leone Safe Water
GS-1869 ↗ · current registry ID: GS7483
#881of 1329 in Industrial#15of 16 in Sierra Leone#1297of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe water project in Sierra Leone has VVB-confirmed additionality and no reversal events, but is undermined by severe operational issues including 4,193 borehole failure days, two retired boreholes, a 12-percentage-point drop in usage rate, and the absence of a buffer pool. The project is significantly under-delivering relative to ex-ante estimates due to GS-TAC caps, which limits over-crediting risk but raises questions about baseline realism. Extensive corrective actions and 13 inter-document contradictions reduce confidence in the data record.
Red Flags
- 4,193 total borehole failure days recorded during the monitoring period, with two boreholes subsequently retired from the project
- Leakage deduction reduced from 5% in the PDD to 0% in the 2026 verification report with only a 'deemed negligible' justification
- Usage rate dropped from 93.98% to 81.73% between monitoring periods, indicating declining project performance
- Lack of exit strategy explicitly flagged as posing risks to beneficiaries
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 6,420 | 6,420 | 0 | |
| 2021 | 7,141 | 7,135 | 6 | |
| 2022 | 6,614 | 2,226 | 4,388 | |
| 2023 | 2,640 | 0 | 2,640 | |
| Total | 22,815 | 15,781 | 7,034 |
Risk Indicators
VVB-confirmed combined test
operational failures
0% deduction, thin justification
Project-specific, reassessed 2024
FPIC, grievance, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →