GS1247 VPA 225 The Gambia Safe Water
GS-2191 ↗ · current registry ID: GS7581
#172of 1329 in Industrial#3of 8 in Gambia#315of 1801 in Gold Standard (GS)
Audit Analysis
The Gambia Safe Water project (GS1247 VPA 225) is a Gold Standard safe water project with VVB-verified additionality and no reported reversal events, but it carries moderate risk from a project-specific baseline, a 0% leakage deduction that contradicts the PDD's 5% figure, and the absence of a buffer pool. Extensive material findings—including repeated water quality failures and 21 corrective action requests—indicate operational and documentation weaknesses that temper confidence in the credit's robustness.
Red Flags
- Leakage deduction of 0% in the 2024 verification report contradicts the PDD's 5% deduction; the justification shifted from 'deemed negligible' to 'quantified' without clear reconciliation
- 19 boreholes failed water quality testing in Q1 2021 and 11 in Q2 2021 due to coliforms, indicating operational reliability concerns
- Five Forward Action Requests (FARs) remain open, including evaluation of SDG indicators and submission of an fNRB report at VPA level
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 4,166 | 4,062 | 104 | |
| 2021 | 5,537 | 4,826 | 711 | |
| 2022 | 6,733 | 330 | 6,403 | |
| 2023 | 5,294 | 220 | 5,074 | |
| Total | 21,730 | 9,438 | 12,292 |
Risk Indicators
VVB-confirmed combined test
infrastructure degradation risk
0% deduction contradicts PDD 5%
Project-specific; reassessed 2024
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →