Skip to main content
GSEnergy Efficiency - DomesticSierra LeoneGeneral Methodologyv2.1

GS1247 VPA 231 Sierra Leone Safe Water

GS-2653 ↗ · current registry ID: GS10663

#616of 1329 in Industrial#8of 16 in Sierra Leone#942of 1801 in Gold Standard (GS)

4.9/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
3.5
Documentation
5.0

Audit Analysis

A Gold Standard safe-water / thermal-energy-displacement project in Sierra Leone with VVB-confirmed additionality and no reversal events, but undermined by a large discrepancy between the PDD's ex-ante estimate (10,000 ERR) and the verified figure (86,933 ERR), a 0% leakage deduction that contradicts the PDD's 5% assumption, ten cross-document contradictions, and five open findings requiring action. The project's methodology applicability to water-treatment technologies and its sector classification (listed as 'industrial' despite a domestic credit type) raise further questions about the robustness of the credit claim.

Red Flags

  • PDD ex-ante ERR estimate of 10,000 is 8.7× lower than the 86,933 ERR verified in the 2024 verification report, suggesting significant over-crediting or scope expansion not clearly documented
  • Leakage deduction of 0% in the verification report contradicts the PDD's 5% assumption; the justification shifts from 'deemed negligible' (monitoring report) to 'quantified' (verification report) without a clear reconciliation
  • Ten contradictions across documents span leakage, ERR, usage rate, fNRB, additionality test type, and crediting period, indicating inconsistent data management
  • Five open findings (FAR 01–05) relate to SDG indicators, fNRB reporting, and monitoring justification at the VPA level, none yet closed
  • Methodology 'Technologies and Practices to Displace Decentralized Thermal Energy Consumption' applied to safe-water boreholes raises applicability concerns; the validation report itself flagged the need for justification

Credit Vintages

IssuedRetiredAvailable
2022
5,9575,600357
2023
3,54103,541
Total9,4985,6003,898

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, contradictory justifications

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents