GS1247 VPA 24 Improved Kitchen Regimes - Dowa Boreholes, Malawi
GS-497 ↗ · current registry ID: GS3105
#965of 1329 in Industrial#67of 92 in Malawi#1391of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard borehole/improved-kitchen project in Malawi has confirmed additionality and no reversal events, but is undermined by extensive operational failures (multiple boreholes non-functional, water-quality test failures, 25 boreholes retired), a project-specific baseline, a leakage deduction that dropped from 5% in the PDD to 0% in the latest verification, and a very long list of corrective actions and data inconsistencies across documents. The overall picture is of a project with a sound design framework but significant execution and data-quality problems that erode confidence in the claimed reductions.
Red Flags
- Multiple boreholes reported non-functional or retired during 2025 (374-048, 374-082, 374-015, BORDOKA25 ran dry in dry season) while the project still claims 51,336 tCO2e for the period
- Leakage deduction reduced from 5% in the PDD (2023) to 0% 'deemed negligible' in the 2026 verification report, with no quantified leakage analysis in the latest documents
- fNRB value increased from 0.81 (2019 monitoring report) to 0.94 (2026 verification report), directly increasing the credit claim; the 2026 value required a C4 Ecosolutions report for justification
- 25 boreholes in Kasungu district retired from the project due to SHA exit plan, yet the project continues to claim reductions across the full borehole portfolio
- Registry lists incorrect methodology (TPDDTEC v1) and SDGs for some VPAs; correction request still pending
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 45 | 45 | 0 | |
| 2015 | 9,338 | 9,338 | 0 | |
| 2016 | 10,000 | 10,000 | 0 | |
| 2017 | 10,000 | 10,000 | 0 | |
| 2018 | 9,973 | 8,090 | 1,883 | |
| 2019 | 8,842 | 7,643 | 1,199 | |
| 2020 | 6,507 | 3,761 | 2,746 | |
| 2021 | 6,102 | 3,324 | 2,778 | |
| 2022 | 10,000 | 9,800 | 200 | |
| 2023 | 7,704 | 0 | 7,704 | |
| 2024 | 10,000 | 0 | 10,000 | |
| Total | 88,511 | 62,001 | 26,510 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, weak justification
Project-specific, reassessed 2020
FPIC and grievance present, docs inconsistent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →