Skip to main content
GSEnergy Efficiency - DomesticEthiopiaVintage 2021General Methodologyv2.1

GS1247 VPA 256 Northern Ethiopia Community Safe Water

GS-2724 ↗ · current registry ID: GS10735

#371of 1329 in Industrial#6of 36 in Ethiopia#593of 1801 in Gold Standard (GS)

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.5

Audit Analysis

A Gold Standard safe-water project in Northern Ethiopia displacing firewood for water heating, with verified additionality and no reversal events, but operating in an active conflict zone (Tigray) that has forced multiple deviations, compromised water-quality monitoring, and left no buffer pool in place. The verification report confirms the full claimed ERR of 44,418 tCO₂e, yet a significant discrepancy with the monitoring report (10,785) and a shift from a 5% leakage deduction in the PDD to 0% in the verification report raise over-crediting concerns.

Red Flags

  • Leakage deduction reduced from 5% in the PDD (2023) to 0% in the verification report (2025) with only a 'deemed negligible' justification, despite the project type (community water points) where displacement leakage is plausible.
  • Major ERR discrepancy: the verification report (Aug 2025) states 44,418 tCO₂e while the monitoring report (Jul 2025) states 10,785 tCO₂e — a 4× difference that is not explained in the extracted record.
  • Ongoing civil conflict in Tigray has led to multiple approved deviations (water-quality testing, physical audits, usage surveys), creating a risk that verified activity levels do not reflect actual on-the-ground performance.
  • Five Forward Action Requests remain open from the verification, including evaluation of SDG indicators at VPA level and submission of an fNRB report, indicating unresolved verification gaps.

Credit Vintages

IssuedRetiredAvailable
2020
7507500
2021
4,9181,9232,995
2022
9,09809,098
2023
8,30208,302
2024
4,84704,847
Total27,9152,67325,242

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

conflict-zone risk

Leakage

0% deduction, weakened from PDD 5%

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents