GS1247 VPA 257 Northern Ethiopia Community Protected Springs
GS-2725 ↗ · current registry ID: GS10736
#695of 1329 in Industrial#15of 36 in Ethiopia#1045of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard community safe-water project in Northern Ethiopia with solid additionality (combined test, VVB-verified) and a recently reassessed baseline, but significantly undermined by the ongoing Tigray conflict, multiple approved deviations, and eleven cross-document contradictions in key figures including ERR, fNRB, and leakage. The project's physical infrastructure (protected springs) provides inherent permanence, yet the absence of a buffer pool and the unresolved data discrepancies create meaningful over-crediting and operational-continuity risks.
Red Flags
- Eleven contradictions across documents, including a 4× discrepancy in total ERR (44,418 in the 2025 verification report vs 10,785 in the 2025 monitoring report) and a 17-percentage-point gap in fNRB (0.83 vs 0.97)
- Ongoing civil conflict in Northern Ethiopia has triggered multiple GS deviations (water quality testing, physical audit, functionality cap reduced to 92.7%), creating material risk to project continuity and data reliability
- Leakage deduction of 0% in the 2025 verification report contradicts a 5% deduction in the 2023 PDD, with the justification shifting from 'quantified' to 'deemed negligible'
- FAR 01 (photograph date/time stamps) and FAR 02 (user distance eligibility) remain open, indicating unresolved verification gaps
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 1,905 | 1,905 | 0 | |
| 2021 | 8,045 | 1,924 | 6,121 | |
| 2022 | 9,188 | 0 | 9,188 | |
| 2023 | 8,134 | 0 | 8,134 | |
| 2024 | 5,491 | 0 | 5,491 | |
| Total | 32,763 | 3,829 | 28,934 |
Risk Indicators
Combined test, VVB-verified
no reversals
0% vs 5% contradiction; deemed negligible
Project-specific; reassessed 2024
FPIC, grievance, benefit sharing documented
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →