GS1247 VPA 310 - Togo Safe Water
#108of 108 in Water#15of 15 in Togo#1793of 1801 in Gold Standard (GS)#806of 806 in AMS-I.D
Audit Analysis
The extracted data for this Togo Safe Water project (Gold Standard, GS-1183) is fundamentally unreliable: the sole document on record describes a 1.1 MW hydroelectric project in West Sumatra, Indonesia, registered under CDM, not a clean drinking water project in Togo. With no verification body identified, no verified emission reduction figures, no monitoring period, and an expired 2010–2017 crediting period, the project cannot be assessed with any confidence.
Red Flags
- Critical data integrity failure: the PDD on file names the project '1.1 MW Manggani Mini Hydroelectric Project, West Sumatra, Indonesia' (CDM, AMS I.D.), which is an entirely different project from the Togo Safe Water project being scored (Gold Standard, water sector). All extracted facts may be inapplicable.
- No verification body (VVB) is identified in any available document, and no verified emission reduction figure exists; the only ERR number (36,407) is a claimed ex-ante estimate with no monitoring-period counterpart.
- The crediting period (March 2010 – March 2017) has expired, and no monitoring report or baseline reassessment is on record.
- FPIC status is contradictory within the PDD itself: one section records it as conducted, another as not conducted.
Credit Vintages
No issuances recorded on the registry.
Il marketplace dichiara i vintage: 2024 (non verificato).
Risk Indicators
Investment test stated but no VVB confirmation found
permanence unaddressed
0% deduction labelled 'quantified' but no supporting detail
Jurisdictional method stated; no reassessment date on record
FPIC contradictory in PDD; grievance mechanism not stated
CCP and CORSIA status not stated in available documents
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →