Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

GS1247 VPA 43 Alebtong, Dokolo, Otuke District Boreholes

GS-726 ↗ · current registry ID: GS4260

#829of 1329 in Industrial#103of 163 in Uganda#1228of 1801 in Gold Standard (GS)

4.6/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.5

Audit Analysis

A Gold Standard borehole project in Uganda with VVB-verified additionality and no reversal events, but undermined by an extensive list of unresolved and resolved corrective actions, a 0% leakage deduction that contradicts the original 5% in the PDD, a 64% water-quality pass rate with three boreholes removed from crediting, and a massive discrepancy in verified ERR figures (1,740 vs 10,746 tCO₂e) across two verification reports. The project's core design is sound, but the MRV quality and data consistency raise material concerns about the reliability of the claimed reductions.

Red Flags

  • Verified ERR of 1,740 tCO₂e (2026 verification) vs 10,746 tCO₂e (2025 verification) — a 6× discrepancy that is unexplained and undermines confidence in the credit quantity
  • Leakage deduction reduced from 5% (PDD, 2023) to 0% 'deemed negligible' (2026 verification) without a documented re-assessment; the VPA DD requires leakage assessment every other year and this was flagged as missing in the MR
  • Water quality tests show only 64% pass rate; three boreholes (Anotocao, Te-Dam, Bua Yubu) were removed from crediting for failing national standards, and 2,064 failure days were recorded across all boreholes
  • 10 Corrective Action Requests and 17 Clarification Requests raised in the latest verification cycle, including inconsistencies in ERR calculations, parameter values, and borehole counts across MR sections
  • FPIC status is contradictory: the monitoring report (2024) states it was not conducted, while the validation report (2025) states it was conducted

Credit Vintages

IssuedRetiredAvailable
2013
1,2851,2850
2014
9,0959,0950
2015
9,5139,5130
2016
10,00010,0000
2017
10,00010,0000
2018
10,00010,0000
2019
7,0747,0740
2020
3,0343,0340
2021
1,5291,50920
2022
1,5401,51030
2023
1,317657660
2024
7840784
Total65,17163,6771,494

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

borehole failure risk

Leakage

0% with weak justification; PDD had 5%

Baseline

Project-specific; reassessed 2024

Safeguards

Grievance mechanism present; FPIC contradictory

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents