GS1247 VPA 5 Alebtong District Borehole Project
GS-376 ↗ · current registry ID: GS2481
#831of 1329 in Industrial#105of 163 in Uganda#1230of 1801 in Gold Standard (GS)
Audit Analysis
The Alebtong District Borehole Project (GS2481) is a Gold Standard energy-efficiency project displacing thermal energy for water heating in Uganda. While additionality is VVB-confirmed and no reversal events have occurred, the project is undermined by a significant leakage contradiction (0% in the 2026 verification report versus 5% in the PDD), the absence of a buffer pool, substantial operational failures (1,698 failure days, five boreholes removed from crediting), and a high volume of unresolved documentation inconsistencies across 12 identified contradictions.
Red Flags
- Leakage deduction dropped from 5% in the PDD (2023) to 0% in the 2026 verification report with only a 'deemed negligible' justification, creating an over-crediting risk of up to 5% of all claimed reductions
- No buffer pool is in place despite 1,698 recorded failure days (83% operationality) and five boreholes removed from crediting during the monitoring period, leaving no financial backstop for potential reversals
- FPIC status is contradictory: the 2024 monitoring report states it was not conducted, while the 2025 validation report states it was conducted — a fundamental free, prior, and informed consent issue for a community water project
- The verified ERR dropped from 10,746 tCO₂e (January 2025 verification) to 3,058 tCO₂e (May 2026 verification), a 71% reduction, driven by borehole removals but raising questions about the durability of the project's emission claims
- Twelve contradictions were identified across documents, including conflicting crediting period dates, fNRB methods (national default vs. local field), and usage monitoring approaches (annual survey vs. assumed), indicating systemic data-reliability concerns
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 9,174 | 9,174 | 0 | |
| 2015 | 10,000 | 10,000 | 0 | |
| 2016 | 10,000 | 10,000 | 0 | |
| 2017 | 10,000 | 10,000 | 0 | |
| 2018 | 10,000 | 10,000 | 0 | |
| 2019 | 8,456 | 8,456 | 0 | |
| 2020 | 5,310 | 5,310 | 0 | |
| 2021 | 2,915 | 1,468 | 1,447 | |
| 2022 | 2,056 | 2,016 | 40 | |
| 2023 | 2,118 | 1,750 | 368 | |
| 2024 | 1,373 | 0 | 1,373 | |
| Total | 71,402 | 68,174 | 3,228 |
Risk Indicators
VVB-confirmed combined test
1,698 failure days; 5 boreholes removed
0% deduction vs 5% in PDD; 'deemed negligible' justification
Project-specific baseline; reassessed 2024; method not jurisdictional
Grievance mechanism present; FPIC status contradictory across documents
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →