GS1247 VPA 5 Alebtong District Borehole Project

GS-376 ↗ · current registry ID: GS2481

#831of 1329 in Industrial#105of 163 in Uganda#1230of 1801 in Gold Standard (GS)

4.6/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
4.5
Documentation
4.0

Audit Analysis

The Alebtong District Borehole Project (GS2481) is a Gold Standard energy-efficiency project displacing thermal energy for water heating in Uganda. While additionality is VVB-confirmed and no reversal events have occurred, the project is undermined by a significant leakage contradiction (0% in the 2026 verification report versus 5% in the PDD), the absence of a buffer pool, substantial operational failures (1,698 failure days, five boreholes removed from crediting), and a high volume of unresolved documentation inconsistencies across 12 identified contradictions.

Red Flags

  • Leakage deduction dropped from 5% in the PDD (2023) to 0% in the 2026 verification report with only a 'deemed negligible' justification, creating an over-crediting risk of up to 5% of all claimed reductions
  • No buffer pool is in place despite 1,698 recorded failure days (83% operationality) and five boreholes removed from crediting during the monitoring period, leaving no financial backstop for potential reversals
  • FPIC status is contradictory: the 2024 monitoring report states it was not conducted, while the 2025 validation report states it was conducted — a fundamental free, prior, and informed consent issue for a community water project
  • The verified ERR dropped from 10,746 tCO₂e (January 2025 verification) to 3,058 tCO₂e (May 2026 verification), a 71% reduction, driven by borehole removals but raising questions about the durability of the project's emission claims
  • Twelve contradictions were identified across documents, including conflicting crediting period dates, fNRB methods (national default vs. local field), and usage monitoring approaches (annual survey vs. assumed), indicating systemic data-reliability concerns

Credit Vintages

IssuedRetiredAvailable
2014
9,1749,1740
2015
10,00010,0000
2016
10,00010,0000
2017
10,00010,0000
2018
10,00010,0000
2019
8,4568,4560
2020
5,3105,3100
2021
2,9151,4681,447
2022
2,0562,01640
2023
2,1181,750368
2024
1,37301,373
Total71,40268,1743,228

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

1,698 failure days; 5 boreholes removed

Leakage

0% deduction vs 5% in PDD; 'deemed negligible' justification

Baseline

Project-specific baseline; reassessed 2024; method not jurisdictional

Safeguards

Grievance mechanism present; FPIC status contradictory across documents

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents