GS1247 VPA 71 Lango Safe Water Project
GS-901 ↗ · current registry ID: GS5106
#1009of 1329 in Industrial#127of 163 in Uganda#1442of 1801 in Gold Standard (GS)
Audit Analysis
The Lango Safe Water Project (VPA 71) is a Gold Standard domestic water-pumping efficiency project in Uganda with VVB-confirmed additionality and a recently reassessed baseline, but it is burdened by 22 open corrective actions, extensive material findings (including fNRB calculation errors and breakdown-day inconsistencies), and ten cross-document contradictions that undermine confidence in the underlying data. The absence of a buffer pool, a 0% leakage deduction with contradictory justification, and unresolved fNRB methodology disputes leave meaningful over-crediting and permanence risk unaddressed.
Red Flags
- 22 open corrective actions spanning fNRB recalculation, missing ER spreadsheets, incorrect breakdown-day accounting, and missing GPS coordinates indicate systemic data-quality problems in the MRV chain.
- Leakage deduction is 0% in the verification report but 5% in the PDD, and the justification flips between 'quantified' and 'deemed negligible' across documents — the 0% figure is not well-supported.
- No buffer pool percentage is stated in any available document, leaving no quantified safeguard against reversal or over-crediting.
- The fNRB was calculated with an incorrect Tool 30 version and lacked transparent parameter evidence, and a forward action requires the project developer to recalculate it in-house.
- Ten contradictions across documents, including the additionality test type being listed as both 'combined' and 'investment' within the same PDD on the same date, raise questions about internal consistency.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 603 | 603 | 0 | |
| 2017 | 9,972 | 9,972 | 0 | |
| 2018 | 10,000 | 10,000 | 0 | |
| 2019 | 6,699 | 6,699 | 0 | |
| 2020 | 6,157 | 5,378 | 779 | |
| 2021 | 3,475 | 3,435 | 40 | |
| 2022 | 3,302 | 2,774 | 528 | |
| 2023 | 870 | 0 | 870 | |
| Total | 41,078 | 38,861 | 2,217 |
Risk Indicators
VVB-confirmed combined test
no reversals
0% deduction contradicted by PDD 5%
Project-specific; reassessed 2024
FPIC done; grievance books misused
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →