Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

GS1247 VPA 73 Lango Safe Water Project

GS-917 ↗ · current registry ID: GS5187

#701of 1329 in Industrial#85of 163 in Uganda#1051of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

The Lango Safe Water Project (borehole infrastructure in Uganda) has VVB-confirmed additionality and no reported reversal events, but is undermined by a 0% leakage deduction that contradicts the PDD's 5% figure, an absence of any buffer pool, and an extensive list of corrective actions and forward action requests flagging operational breakdowns, water-quality failures, and calculation inconsistencies. The project is delivering slightly above its claimed emission reductions, yet the documentation quality and internal consistency across documents remain a significant concern.

Red Flags

  • Leakage deduction of 0% in the verification report directly contradicts the 5% deduction stated in the PDD; the justification shifts from 'quantified' to 'deemed negligible' between documents, weakening the credibility of the zero-deduction claim.
  • The verification report lists seven project-specific corrective actions (missing ER calculations, inconsistent breakdown days, missing coordinates, incorrect monitoring dates, inconsistent SDG values, incorrect table values, sampling-design inconsistencies) plus four forward action requests (seasonal WCFT variations, root-cause of time-saving reduction, water-quality failure measures, fNRB recalculation), indicating material unresolved quality issues.
  • FPIC status is contradictory: the monitoring report (May 2023) states it was not conducted, while the validation report (August 2025) states it was conducted, raising questions about the timing and scope of free, prior, and informed consent.
  • The monitoring period (Jan 2023 – Dec 2024) precedes the current crediting period (May 2025 – Apr 2030), meaning the most recent verified data does not yet cover the active crediting window.

Credit Vintages

IssuedRetiredAvailable
2016
2,2132,2130
2017
9,9529,9520
2018
10,00010,0000
2019
6,2766,2760
2020
4,9414,9410
2021
2,8902,85733
2022
2,8332,77855
2023
7380738
Total39,84339,017826

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals but operational risk unmitigated

Leakage

0% deduction contradicted by PDD's 5%; justification inconsistent

Baseline

Project-specific baseline; reassessed 2024 but not standardised

Safeguards

Grievance mechanism and benefit sharing present; FPIC status contradictory

Double-claim

CORSIA and CCP status both not stated; dual-channel risk unconfirmed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents