GS1247 VPA 87 Southern Ethiopia Community Boreholes

GS-953 ↗ · current registry ID: GS5323

#1211of 1329 in Industrial#31of 36 in Ethiopia#1675of 1801 in Gold Standard (GS)

3.8/ 10
Integrity
4.0
Transparency
3.5
Claim Safety
3.5
Documentation
4.0

Audit Analysis

This Gold Standard energy-efficiency project in Ethiopia has a confirmed additionality assessment and no reported reversals, but is undermined by ten cross-document contradictions, an extensive list of over forty corrective actions, a verification report dating to 2018, and a project name (community boreholes) that does not align with the cookstove methodology applied. Key verified figures—including lifetime ex-ante ERR, verified ERR, and buffer-pool allocation—are absent from the extracted record, leaving the credit quantity and permanence safeguards largely unquantified.

Red Flags

  • Ten contradictions across documents, including conflicting ERR figures (96,198 vs 48,465), conflicting leakage deductions (0% vs 5%), and conflicting usage rates (1.0 vs 95), indicating serious data-reliability problems.
  • Over forty corrective actions remain open, covering baseline data gaps, methodology version mismatches, missing efficiency test reports, and unclear additionality for retroactive VPAs.
  • The project name references community boreholes and safe water, yet the applied methodology (TPDDTEC v.4.0) is a cookstove standard; the scope and technology boundary are unclear.
  • Total verified ERR and lifetime ex-ante ERR are not found in any available document, so the credit quantity cannot be independently cross-checked.
  • The most recent verification report is dated March 2018, while the current crediting period runs from May 2025 to April 2030, leaving a seven-year gap in independent verification.

Credit Vintages

IssuedRetiredAvailable
2017
5,0365,0360
2018
10,00010,0000
2019
4,6534,6530
2020
4,9684,9680
2021
2,8922,86230
2022
1,9741,93539
2023
4540454
Total29,97729,454523

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction contradicted by 5% in PDD

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.