Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

GS12943 VPA-1 OYU - Building Sustainable Nigerian Communities VPA01

GS-4659 ↗ · current registry ID: GS12944

#703of 1329 in Industrial#34of 79 in Nigeria#1054of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.0

Audit Analysis

A Gold Standard cookstove project in Nigeria with VVB-verified additionality and quantified leakage, but undermined by six material findings (including incorrect ER calculation formulas), over 20 corrective actions, a project-specific baseline with no stated reassessment date, and a 10-percentage-point gap between assumed and verified usage rates. The project over-delivered relative to its pro-rata expectation, suggesting a conservative baseline, but the volume of documentation deficiencies raises questions about the robustness of the underlying MRV.

Red Flags

  • Six material findings in the verification report, including incorrect formulas used in ER calculation and missing evidence for usage-rate monitoring, training records, and manufacturing dates
  • Over 20 corrective actions required, indicating systemic documentation gaps across the PDD, monitoring report, and stakeholder consultation records
  • FPIC not conducted per the final PDD (June 2023), despite the project targeting vulnerable Nigerian communities
  • Usage rate assumed at 100% in the PDD but verified at only 90% in the monitoring report, a 10-percentage-point overstatement

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

no reversals

Leakage

5% quantified deduction

Baseline

Project-specific; no reassessment date

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents