Skip to main content
GSEnergy Efficiency - DomesticBurkina FasoGeneral Methodologyv2.1

GS1340 Efficient cookstoves in Burkina Faso - VPA-04 - tiipaalga F3PA cookstoves in Bam and Loroum

GS-616 ↗ · current registry ID: GS3518

#174of 1329 in Industrial#4of 33 in Burkina Faso#317of 1801 in Gold Standard (GS)

5.6/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A Gold Standard cookstove project in Burkina Faso with confirmed additionality and a quantified 5% leakage deduction, but undermined by the absence of a buffer pool, a project-specific baseline with no recorded reassessment, and a lengthy list of 16 corrective actions stemming from security-related monitoring gaps and data-quality issues. The verified usage rate (95.07%) closely matches the assumed 95%, supporting the core emission-reduction claim, yet multiple cross-document contradictions and medium extraction confidence limit overall reliability.

Red Flags

  • No buffer pool or permanence safeguard identified for this avoidance-type cookstove project, leaving reversal risk (stove abandonment, breakage) unaddressed beyond the 5% leakage deduction.
  • 16 corrective actions required by SustainCERT, including hidden rows in the ER spreadsheet, a >1-year gap between monitoring surveys due to security instability, and 55 sampled households unvisited and scored as 0% users.
  • FPIC status is contradictory: the PDD (2022) states FPIC was conducted, while the 2023 verification report records it as not conducted.
  • Baseline is project-specific with no recorded reassessment date, and the crediting period (2015–2025) is nearing its end without documented baseline updates.

Credit Vintages

IssuedRetiredAvailable
2015
1,8081,309499
2016
5,0532,4792,574
2017
9,8851979,688
2018
9,87219,871
2019
8,55808,558
2020
9,9959,796199
2021
8,4522,4016,051
2022
6,5668475,719
Total60,18917,03043,159

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

security-driven reversal risk

Leakage

5% quantified deduction

Baseline

Project-specific; no reassessment recorded

Safeguards

Grievance mechanism present; FPIC contradictory

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents