GS1340 Efficient cookstoves in Burkina Faso - VPA-04 - tiipaalga F3PA cookstoves in Bam and Loroum
GS-616 ↗ · current registry ID: GS3518
#174of 1329 in Industrial#4of 33 in Burkina Faso#317of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Burkina Faso with confirmed additionality and a quantified 5% leakage deduction, but undermined by the absence of a buffer pool, a project-specific baseline with no recorded reassessment, and a lengthy list of 16 corrective actions stemming from security-related monitoring gaps and data-quality issues. The verified usage rate (95.07%) closely matches the assumed 95%, supporting the core emission-reduction claim, yet multiple cross-document contradictions and medium extraction confidence limit overall reliability.
Red Flags
- No buffer pool or permanence safeguard identified for this avoidance-type cookstove project, leaving reversal risk (stove abandonment, breakage) unaddressed beyond the 5% leakage deduction.
- 16 corrective actions required by SustainCERT, including hidden rows in the ER spreadsheet, a >1-year gap between monitoring surveys due to security instability, and 55 sampled households unvisited and scored as 0% users.
- FPIC status is contradictory: the PDD (2022) states FPIC was conducted, while the 2023 verification report records it as not conducted.
- Baseline is project-specific with no recorded reassessment date, and the crediting period (2015–2025) is nearing its end without documented baseline updates.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 1,808 | 1,309 | 499 | |
| 2016 | 5,053 | 2,479 | 2,574 | |
| 2017 | 9,885 | 197 | 9,688 | |
| 2018 | 9,872 | 1 | 9,871 | |
| 2019 | 8,558 | 0 | 8,558 | |
| 2020 | 9,995 | 9,796 | 199 | |
| 2021 | 8,452 | 2,401 | 6,051 | |
| 2022 | 6,566 | 847 | 5,719 | |
| Total | 60,189 | 17,030 | 43,159 |
Risk Indicators
VVB-confirmed combined test
security-driven reversal risk
5% quantified deduction
Project-specific; no reassessment recorded
Grievance mechanism present; FPIC contradictory
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →