GS1340 Efficient cookstoves in Burkina Faso - VPA-05 - tiipaalga F3PA cookstoves in Bam and Loroum
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB in the verification report, which supports the project’s core eligibility case.
missing The verification report records a material finding and numerous corrective actions, while reversal risk is not addressed and no buffer pool is stated.
Transparency
verified The monitoring period is clearly stated for 2022 and the project has a named VVB, SustainCERT, which supports basic MRV traceability.
missing Total ER figures are not stated in the extracted record, and low extraction confidence plus several document contradictions weaken transparency.
Claim Safety
verified Leakage is at least quantified, with a leakage deduction of 0.95% in the monitoring report.
missing The project is marked CORSIA-eligible, which increases dual-claim sensitivity, and the usage rate and FNRB values conflict sharply across documents.
Documentation
verified The record includes a PDD, monitoring report, verification report, and 19 extracted facts, with FPIC and a grievance mechanism both mentioned.
missing Extraction confidence is low, and the verification report required multiple corrective actions, indicating incomplete or difficult-to-verify documentation.
Detailed Analysis
Integrity
The verification report from 2024 confirms additionality through VVB review, which is a meaningful positive signal. However, the same report includes a material finding about traceability of households, technology, and usage rate, and it lists many corrective actions, which weakens confidence in the robustness of the monitoring and crediting basis. Reversal risk is not addressed in the extracted record, and no buffer pool percentage is stated.
Transparency
The project has a named verifier, SustainCERT, and a clearly defined 2022 monitoring period, which helps basic traceability. Still, total ER claimed and verified are not found in the extracted record, and the extraction confidence is low, meaning at least one key document was poorly readable. The record also contains several cross-document inconsistencies, which further reduces transparency.
Claim Safety
Leakage is at least quantified, with a 0.95% deduction in the monitoring report, which is better than leaving leakage untreated. Even so, the project is marked CORSIA-eligible, so claim separation deserves caution, and the usage rate and FNRB values vary sharply across documents. Those contradictions raise over-crediting and claim-quality risk.
Documentation
The extracted record draws from four document types, including the PDD, monitoring report, and verification report, and it notes FPIC, a grievance mechanism, and benefit sharing. But the extraction confidence is low, and the verification report required many corrective actions, suggesting the documentation is not clean or fully reliable. The crediting period is also inconsistent across documents, which adds to the documentation weakness.
Overall
I privileged the 2024 verification report for additionality, safeguards, and the latest quality-control findings, while using the more recent monitoring-report values where they were explicitly identified in the contradictions list. The contradictions are material: usage rate differs dramatically, leakage deduction changes from 5% to 0.95%, FNRB shifts from 98 to 0.9, and the crediting period is inconsistent, so reliability is reduced and scores are pulled down. Because documentation quality is only moderate and integrity is below strong levels, the project lands in the middle range rather than a high-confidence category.
Audit Analysis
This is a cookstove project with some positive evidence on additionality, safeguards, and quantified leakage, but the record shows several material verification issues and low extraction confidence. The project appears moderately documented, yet contradictions in usage rates, leakage, FNRB, and crediting period reduce trust in the reported performance and claims.
Project Description
Developer: Tiipaalga Type: Energy Efficiency - Domestic Size: Micro Scale Crediting period: 2015-02-02 → 2025-02-01 Estimated annual credits: 8820 tCO2e SDGs: Goal 15: Life On Land, Goal 3: Good Health and Well-Being, Goal 13: Climate Action
Red Flags
- The verification report raised a material finding about traceability of households, technology, and usage rate, and listed many corrective actions.
- There are multiple contradictions across documents, including very different usage rates, leakage deductions, FNRB values, and crediting period dates.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 2,213 | 2,213 | 0 | |
| 2016 | 6,000 | 5,891 | 109 | |
| 2017 | 9,870 | 9,805 | 65 | |
| 2018 | 9,433 | 188 | 9,245 | |
| 2019 | 8,133 | 0 | 8,133 | |
| 2020 | 9,994 | 6,525 | 3,469 | |
| 2021 | 8,193 | 2,328 | 5,865 | |
| 2022 | 10,000 | 1,292 | 8,708 | |
| Total | 63,836 | 28,242 | 35,594 |
Cosa migliorerebbe questo punteggio
- Publish a clean reconciliation of the contradictory usage rate, leakage deduction, FNRB, and crediting-period values across the PDD, monitoring reports, and verification report.
- Provide a complete, readable monitoring package with total ER claimed and verified, clearer traceability evidence, and explicit treatment of reversal risk and buffer arrangements.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No buffer pool stated
Quantified but inconsistent
Project baseline, reassessment unclear
FPIC and grievance mechanism present
CORSIA-eligible status
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- (2)Monitoring Report_1st monitoring period_08.02.2015 to 31.12.2015_v2.pdf
- (2)Monitoring Report_4th monitoring period_01.01.2018 to 31.12.2018_v1.pdf
- T-PerfCert_V1.1- MR_GS1340_GS2456_GS3516-GS3524_MP8_v4(14).pdf
- GS 1340 - VPA 01-10 - ER_MP8_ v2.0(14).xlsx
- Monitoring Report_5th monitoring period_01.01.2019 to 31.12.2019_v1.pdf
- (2)Monitoring Report_3rd monitoring period_01.01.2017 to 31.12.2017_v3.pdf
- +4 more
validation
- (2)Verification Report_4th monitoring period_01.01.2018 to 31.12.2018.pdf
- CCIPL1777_FVR_v1_26072023(7).pdf
- CCIPL 1325 FVR V.5.0 Clean.pdf
- 28052024_Verification-Report_GS2456 GS3516-24-MP8-PoA_GS1340-Burkina-Faso.docx(14).pdf
- T-V5.0-Deviation-Request-Form_PoA GS1340 Verification Vintage 2022_v3.0_SC_FINAL.pdf
- GS1340_GS2456_GS3516-24_6th M.P_Verification Report.pdf
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →