GS1354 Vietnam Small Hydro PoA - Krong No 3 Hydropower Project
GS-484 ↗ · current registry ID: GS2712
#547of 1935 in Renewable energy#28of 80 in Vietnam#279of 1801 in Gold Standard (GS)#415of 1287 in ACM0002
Audit Analysis
A Gold Standard small hydro project in Vietnam with a confirmed investment-test additionality (IRR 8.62% below the 11.42% benchmark) and a jurisdictional baseline using a 2020 grid emission factor. The project shows no reversal events and reasonable safeguards, but the absence of a stated buffer pool, missing verified ERR figures, and six cross-document contradictions on key parameters (grid EF, crediting period, ERR quantities, leakage treatment) introduce meaningful uncertainty about the robustness of the credit quantities.
Red Flags
- Six contradictions between the PDD and validation report on core parameters (grid emission factor, crediting period, lifetime ERR, claimed ERR, additionality test type, leakage justification), indicating the project underwent substantial revisions between 2013–2020
- Total verified ERR is not stated in the extracted record, preventing independent confirmation of actual delivery against the ex-ante estimate
- 34 Corrective Action Requests were raised during validation, including issues with grid emission factor consistency, missing reservoir area justification, and missing monitoring parameters — all closed but indicative of initial documentation gaps
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
VVB-confirmed investment test, IRR below benchmark
mixed evidence / unresolved risk
Deemed negligible, appropriate for hydro displacement
Jurisdictional baseline, 2020 grid EF
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →