Skip to main content
GSEnergy Efficiency - DomesticGhanaAMS-II.G

GS1385 Man and Man Enterprise Improved Cooking Stoves Programme in Ghana - VPA001

GS-306 ↗ · current registry ID: GS2094

#900of 1329 in Industrial#17of 21 in Ghana#1318of 1801 in Gold Standard (GS)#141of 189 in AMS-II.G

4.5/ 10
Integrity
4.0
Transparency
5.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

This Gold Standard improved cooking stove project in Ghana has a verified additionality assessment and a quantified 5% leakage deduction, but is undermined by an extraordinary volume of calculation errors, parameter inconsistencies, and corrective actions spanning multiple verification cycles. The project delivered roughly 53% of its pro-rata ex-ante expectation for the 2024 monitoring period, indicating under-delivery rather than over-crediting, yet the sheer number of MRV errors raises serious questions about the reliability of the verified figures. Documentation quality is further weakened by medium extraction confidence, contradictory values across reports, and an unresolved FPIC discrepancy.

Red Flags

  • Over 60 material findings and corrective actions across verification cycles, including incorrect pro-rata factors, duplicate stove serial entries, parameter mismatches between the monitoring report and ER sheet, and incorrect efficiency calculations — indicating systemic MRV quality problems
  • FPIC status is contradictory: the 2024 monitoring report states FPIC was not conducted, while the 2026 validation report states it was — an unresolved discrepancy in a key safeguard
  • FNRB value and method changed between reporting periods (0.99 local field in 2021 to 0.824 national default in 2025), and the 2024 report used a local field method, creating uncertainty about which baseline factor is appropriate
  • EPA licence for the manufacturing facility had not been received at the time of the 2025 verification, raising regulatory compliance concerns
  • No buffer pool, no permanence mechanism, and no LCA are documented, leaving reversal and permanence risks unaddressed

Credit Vintages

IssuedRetiredAvailable
2013
939639300
2014
33,77533,575200
2015
109,141109,1410
2016
138,150136,3671,783
2017
205,720205,7200
2018
253,747242,94610,801
2019
281,342281,3420
2020
358,151358,1501
2021
458,563445,86412,699
2022
757,025272,794484,231
2023
733,75934,250699,509
2024
736,17030,000706,170
Total4,066,4822,150,7881,915,694

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction

Baseline

Project-specific, reassessed 2025

Safeguards

Grievance mechanism present; FPIC status contradictory

Double-claim

CCP eligible, CORSIA not eligible

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10AMS-II.G. version 12.0: Energy efficiency measures in thermal applications of non-renewable biomass

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents