Skip to main content
GSEnergy Efficiency - DomesticMyanmarGeneral Methodologyv2.1

GS1729 Myanmar Stoves Campaign - Soneva in Myanmar - VPA No. 008

GS-1497 ↗ · current registry ID: GS6338

#902of 1329 in Industrial#21of 25 in Myanmar#1320of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

The Myanmar Stoves Campaign is a cookstove efficiency project under Gold Standard with a quantified 5% leakage deduction and no material findings, but it carries significant integrity concerns: the 2024 verification report does not confirm additionality, the assumed 100% usage rate was verified at only 52.63%, and 22 corrective actions remain open. Seven cross-document contradictions—including conflicting additionality verification status, ERR figures, and crediting-period dates—undermine confidence in the data record.

Red Flags

  • Additionality was NOT confirmed by the VVB in the 2024 verification report, directly contradicting the 2023 validation report which stated it was verified.
  • Assumed usage rate of 100% versus a verified rate of only 52.63% represents a 47-percentage-point gap that materially affects credit validity.
  • 22 corrective actions remain open in the 2024 verification report, including errors in the crediting-period start date, discount factor, household size, and firewood consumption figures.
  • FPIC was not conducted, and the crediting-period end date is missing from the verification report.
  • The 2022 monitoring report records only 4,588 tCO2e while the 2024 verification report records 25,298 tCO2e for the claimed ERR, a five-fold discrepancy that is unexplained.

Credit Vintages

IssuedRetiredAvailable
2017
7277270
2018
8,5998,5990
2019
7,1916,491700
2020
6,59206,592
2021
2,89902,899
Total26,00815,81710,191

Risk Indicators

Additionality

Investment test present but not VVB-confirmed (2024 VR)

Permanence

no reversal events; cookstove avoidance

Leakage

5% quantified deduction in 2024 verification report

Baseline

Project-specific baseline; no reassessment date recorded

Safeguards

Grievance mechanism and benefit sharing present; FPIC not conducted

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents