Skip to main content
GSEnergy Efficiency - DomesticMyanmarGeneral Methodologyv2.1

GS1729 Myanmar Stoves Campaign - Soneva in Myanmar - VPA No. 012

GS-1527 ↗ · current registry ID: GS7343

#836of 1329 in Industrial#18of 25 in Myanmar#1236of 1801 in Gold Standard (GS)

4.6/ 10
Integrity
3.8
Transparency
5.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

This Gold Standard cookstove project in Myanmar has a verified additionality assessment and reasonable fNRB, but is undermined by an extensive list of calculation errors (10 CARs, 3 CLs), a 0% leakage deduction that contradicts the project's own monitoring report, no buffer pool, and a large gap between the assumed 100% usage rate and the verified 71.88%. The project over-delivers relative to its pro-rata ex-ante expectation, which is positive, but the volume of corrective actions and data contradictions significantly erode confidence in the underlying calculations.

Red Flags

  • Ten corrective action requests (CAR-1 through CAR-10) and three compliance-level findings (CL-1 through CL-3) in the November 2023 verification report, including errors in baseline calculations, net benefit computations, and survey precision — indicating systemic calculation weaknesses
  • Leakage deduction of 0% in the verification report contradicts the 5% figure in the project's own monitoring report (November 2023), with the justification merely stated as 'quantified' without transparent methodology
  • No buffer pool is established for a project with inherent permanence risk (stove breakage, household reversion to biomass), and no reversal events data is available
  • Usage rate assumed at 100% in the ex-ante estimate but verified at only 71.88% in the monitoring report, a 28-point gap that inflates the ex-ante baseline
  • The Greenway Prime stove was removed from the project due to non-compliance with methodology efficiency testing requirements, indicating at least one product failed to meet the claimed performance standard

Credit Vintages

IssuedRetiredAvailable
2018
1,2661,2660
2019
7,5486,3311,217
2020
7,03307,033
2021
6,33306,333
2022
4,65904,659
Total26,8397,59719,242

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversal data

Leakage

0% deduction contradicts project's 5%

Baseline

Project-specific; reassessed 2020

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents