Skip to main content
GSEnergy Efficiency - DomesticMyanmarGeneral Methodologyv2.1

GS1729 Myanmar Stoves Campaign - Soneva in Myanmar - VPA No. 014

GS-1830 ↗ · current registry ID: GS7465

#837of 1329 in Industrial#19of 25 in Myanmar#1237of 1801 in Gold Standard (GS)

4.6/ 10
Integrity
4.3
Transparency
5.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

The Myanmar Stoves Campaign is a cookstove efficiency project under Gold Standard with a quantified 5% leakage deduction and a named VVB, but it is undermined by the absence of VVB-confirmed additionality, a missing FPIC process, a 12.6% gap between assumed and verified usage rates, and 28 outstanding corrective actions. Six cross-document contradictions—including a four-fold discrepancy in verified emissions reductions—create material uncertainty about the reliability of the claimed credits.

Red Flags

  • Additionality was not confirmed by the VVB in the 2024 verification report, contradicting the 2023 validation report; the more recent verification report is privileged.
  • Free, Prior and Informed Consent (FPIC) was not conducted, a significant safeguard gap for a community-level cookstove project in Myanmar.
  • The monitoring report (Feb 2024) records verified ERR of 6,574 tCO₂e while the verification report (Apr 2024) records 25,298 tCO₂e — a four-fold discrepancy that is unexplained.
  • 28 corrective actions remain open, spanning data corrections, sampling methodology, stakeholder consultation records, and parameter justifications.
  • Usage rate assumed at 100% in ex-ante calculations but verified at only 87.39%, a 12.6% shortfall that was not reflected in the ex-ante estimate.

Credit Vintages

IssuedRetiredAvailable
2019
7,9747,9740
2020
7,7197,7190
2021
6,661126,649
2022
4,98204,982
Total27,33615,70511,631

Risk Indicators

Additionality

Combined test present but not VVB-confirmed

Permanence

no reversals reported

Leakage

5% quantified deduction

Baseline

Project-specific; reassessment date not stated

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents