GS1729 Myanmar Stoves Campaign - Soneva in Myanmar - VPA No. 017

GS-2823 ↗ · current registry ID: GS10866

#774of 1329 in Industrial#16of 25 in Myanmar#1162of 1801 in Gold Standard (GS)

4.7/ 10
Integrity
5.0
Transparency
4.8
Claim Safety
4.5
Documentation
4.0

Audit Analysis

This Gold Standard cookstove project in Myanmar has a VVB-confirmed additionality assessment and a quantified 5% leakage deduction, but is undermined by 11 material findings, 18 corrective actions, calculation errors in the baseline and project scenario, and a 9-percentage-point gap between the assumed (100%) and verified (91.38%) usage rate. Multiple contradictions across monitoring and verification reports—particularly in ERR figures and the crediting period—raise data-reliability concerns. The absence of a buffer pool, FPIC, and a stated permanence mechanism further weakens the integrity profile.

Red Flags

  • 18 corrective actions required in the 2023 verification report, spanning calculation errors, missing stakeholder evidence, and methodology inconsistencies
  • 11 material findings including an incorrect baseline stove-usage rate (values rounded up), an incorrect non-CO2 emission factor, and survey confidence not demonstrated transparently
  • Usage rate assumed at 100% in the ex-ante estimate but verified at only 91.38% in the 2023 monitoring report—a 9-percentage-point overstatement
  • FPIC not conducted despite the project operating in Myanmar with local community beneficiaries
  • No buffer pool or permanence mechanism documented; no reversal events reported but no safeguard against them

Credit Vintages

IssuedRetiredAvailable
2020
3,64803,648
2021
6,77106,771
2022
3,12203,122
Total13,541013,541

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction applied

Baseline

Project-specific baseline; calculation errors found; no reassessment date

Safeguards

Grievance mechanism and benefit sharing present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents