GS2489 Efficient cookstoves in Benin and Togo – VPA3 – EcoBenin – Women, Soils and Energy

GS-1539 ↗ · current registry ID: GS6998

#541of 1329 in Industrial#5of 7 in Benin#839of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.0
Transparency
5.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A Gold Standard cookstove project in Benin with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by a project-specific baseline, no stated buffer pool, cookstoves found in poor condition during verification, and a 20% overestimation of the usage rate. The project is delivering only 66% of its pro-rata ex-ante expectation, which is conservative but raises questions about the accuracy of the original estimates. Multiple material findings and corrective actions indicate ongoing documentation and operational gaps.

Red Flags

  • Cookstoves found not in good condition due to lack of maintenance or rain protection, as noted in the verification report material findings
  • Usage rate assumed at 0.9 but verified at only 0.75, a 20% overestimation that inflates claimed reductions
  • FPIC not conducted, a gap for a project targeting women and rural communities in Benin
  • Leakage calculation methodology unclear per VVB finding — the verification report notes the ER spreadsheet does not clearly demonstrate the 0.95 discount factor application

Credit Vintages

IssuedRetiredAvailable
2017
16160
2018
1,5841,5840
2019
3,5323,5320
2020
6,0556,0550
2021
6,5824,5092,073
2022
5,9421,7994,143
2023
4,17804,178
Total27,88917,49510,394

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

cookstoves in poor condition

Leakage

5% quantified deduction

Baseline

Project-specific; reassessment timing not stated

Safeguards

FPIC not conducted; grievance mechanism present but contradictory

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents