GS2489 Efficient cookstoves in Benin and Togo – VPA3 – EcoBenin – Women, Soils and Energy
GS-1539 ↗ · current registry ID: GS6998
#541of 1329 in Industrial#5of 7 in Benin#839of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Benin with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by a project-specific baseline, no stated buffer pool, cookstoves found in poor condition during verification, and a 20% overestimation of the usage rate. The project is delivering only 66% of its pro-rata ex-ante expectation, which is conservative but raises questions about the accuracy of the original estimates. Multiple material findings and corrective actions indicate ongoing documentation and operational gaps.
Red Flags
- Cookstoves found not in good condition due to lack of maintenance or rain protection, as noted in the verification report material findings
- Usage rate assumed at 0.9 but verified at only 0.75, a 20% overestimation that inflates claimed reductions
- FPIC not conducted, a gap for a project targeting women and rural communities in Benin
- Leakage calculation methodology unclear per VVB finding — the verification report notes the ER spreadsheet does not clearly demonstrate the 0.95 discount factor application
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 16 | 16 | 0 | |
| 2018 | 1,584 | 1,584 | 0 | |
| 2019 | 3,532 | 3,532 | 0 | |
| 2020 | 6,055 | 6,055 | 0 | |
| 2021 | 6,582 | 4,509 | 2,073 | |
| 2022 | 5,942 | 1,799 | 4,143 | |
| 2023 | 4,178 | 0 | 4,178 | |
| Total | 27,889 | 17,495 | 10,394 |
Risk Indicators
VVB-confirmed combined test
cookstoves in poor condition
5% quantified deduction
Project-specific; reassessment timing not stated
FPIC not conducted; grievance mechanism present but contradictory
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →