Skip to main content
GSEnergy Efficiency - DomesticKenyaGeneral Methodologyv2.1

GS2504 Voluntary Gold Standard Multi-country Improved Cookstove PoA-Flamingo Cookstove Project VPA5

GS-1012 ↗ · current registry ID: GS5780

#905of 1329 in Industrial#110of 157 in Kenya#1323of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
4.0
Documentation
4.5

Audit Analysis

The Flamingo Cookstove VPA5 project has a confirmed additionality assessment and a quantified 5% leakage deduction, but is undermined by nine cross-document contradictions—including a 54% discrepancy in the fuel non-renewable biomass factor and a 30-percentage-point gap between assumed and verified usage rates. Four corrective action requests from the verification body and the absence of a buffer pool or explicit permanence treatment further weaken the project's integrity profile.

Red Flags

  • FNRB value of 0.92 in the verification report (2023-03) contradicts 0.42 in the monitoring report (2023-09), a 54% discrepancy that materially affects credit quantities
  • Usage rate assumed at 80% in the PDD versus 56.4% verified in the most recent monitoring report, indicating a 30-percentage-point over-estimation of cookstove utilisation
  • Leakage deduction of 5% in the 2023 monitoring report versus 95% in the 2021 monitoring report—a 90-percentage-point swing that raises serious data-reliability concerns
  • Four corrective action requests (CAR#01–CAR#04) were raised in the verification report, indicating unresolved compliance issues
  • Reversal events are listed as 'not addressed' in the extracted record, and no buffer pool percentage is stated

Credit Vintages

IssuedRetiredAvailable
2017
5155150
2018
1,3941,3940
2019
1,1671,1670
2020
5825820
2021
3763697
2022
1,4351,40728
Total5,4695,43435

Risk Indicators

Additionality

Combined test confirmed by VVB

Permanence

reversals not addressed

Leakage

5% deduction but 95% contradiction in earlier report

Baseline

Project-specific; last reassessed 2020

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents