Skip to main content
GSSolar Thermal - ElectricityTanzania, United Republic ofGeneral Methodologyv2.1

GS2527 - Mobisol Solar Home Systems in Tanzania – VPA 1

GS-1327 ↗ · current registry ID: GS2528

#232of 352 in Biomass#12of 19 in Tanzania#1603of 1801 in Gold Standard (GS)

4.0/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
3.5
Documentation
3.5

Audit Analysis

The Mobisol Solar Home Systems project in Tanzania has a VVB-verified combined additionality test and a recognised methodology (AMS.I.L v3), but is undermined by 20 material findings including circular references in ER spreadsheets, a 0% leakage deduction with contradictory justifications across documents, and a stark usage-rate gap (12% assumed vs 96% verified). Multiple ERR and usage-rate contradictions between the 2022 and 2026 verification/monitoring reports, combined with 29 outstanding corrective actions, raise significant over-crediting and data-reliability concerns.

Red Flags

  • ER calculation spreadsheet contained circular references and missing input values, undermining the integrity of the credit calculation (verification report, 2026).
  • Usage rate assumed at 12% in the ex-ante estimate but verified at 96% in the monitoring report — an 8-fold discrepancy with no documented explanation.
  • Leakage deduction of 0% is justified as 'quantified' in the verification report but 'deemed negligible' in the monitoring report, creating an internal contradiction.
  • 20 material findings and 29 corrective actions remain open, including failure to complete a required design change to small-scale prior to verification.
  • Inconsistencies in reported emission reductions between monitoring report sections and the micro-scale cap of 10,000 credits/year were flagged by the VVB.

Credit Vintages

IssuedRetiredAvailable
2015
2,2802,2800
2016
10,0009,98515
2017
10,0009,95248
2018
8,1677,405762
2019
10,0007,2402,760
2020
5,0005,0000
Total45,44741,8623,585

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, no reassessment date

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents