GS3428 - Biogas PoA Switzerland - VPA1
GS-704 ↗ · current registry ID: GS4014
#192of 268 in Biogas#14of 14 in Switzerland#1451of 1801 in Gold Standard (GS)#73of 105 in AMS-III.D
Audit Analysis
This Swiss biogas project (Gold Standard, TÜV NORD CERT verified) has a combined additionality test confirmed by the VVB and a measured project-specific baseline, but is undermined by a very large number of material findings and corrective actions, a contradiction in leakage treatment (10% vs 0%), a flip in additionality verification between the 2023 and 2024 reports, and the absence of a buffer pool. The primary extracted document is essentially empty (one page, zero words, titled 'Untitled Document'), which severely limits confidence in the data record.
Red Flags
- Additionality verification flipped from not confirmed (2023 verification report) to confirmed (2024 verification report) — the 2023 report's negative finding is unexplained and raises questions about the robustness of the additionality claim.
- Leakage deduction contradicts between documents: 10% in the 2024 verification report versus 0% in the 2025 validation report, with the justification shifting from 'quantified' to 'deemed negligible'.
- FPIC (Free, Prior and Informed Consent) was not conducted, which is a significant safeguard gap for a community-facing biogas project.
- The primary extracted document contains zero words, one page, and is titled 'Untitled Document' — the data record is extremely thin and the medium extraction confidence compounds the risk of missing critical information.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 993 | 993 | 0 | |
| 2018 | 7,823 | 7,823 | 0 | |
| 2019 | 7,770 | 7,770 | 0 | |
| 2020 | 9,313 | 9,313 | 0 | |
| 2021 | 9,432 | 2,710 | 6,722 | |
| Total | 35,331 | 28,609 | 6,722 |
Risk Indicators
Combined test VVB-confirmed (2024) but 2023 report did not confirm
mixed evidence / unresolved risk
10% deduction (2024) contradicted by 0% (2025 validation)
Project-specific, measured, reassessed 2025
Grievance mechanism and benefit sharing present, but FPIC not conducted
CORSIA and CCP status both not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →