Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS4424 VPA2 African Cookstoves and Water Prorgamme

GS-992 ↗ · current registry ID: GS5634

#542of 1329 in Industrial#34of 139 in Rwanda#840of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.5
Transparency
4.8
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A Gold Standard cookstove project in Rwanda with VVB-verified additionality and matching claimed/verified ERR figures, but undermined by significant contradictions in usage rates and leakage justification across monitoring reports, seven material findings in the verification report, and low extraction confidence in the underlying documents. The project-specific baseline and absence of buffer pool information further weaken the integrity profile.

Red Flags

  • Usage rate verified as 52.74% in the 2023 verification report versus 0.83 (83%) in the 2022 monitoring report — a gap of over 30 percentage points that raises serious data-reliability concerns
  • PDD assumed a 99% usage rate while the monitoring report applied only 70%, indicating the ex-ante estimate may be substantially overstated
  • Seven material findings in the verification report, including inconsistent ICS unit counts across MR sections and an outdated TDR used for random sampling
  • Leakage justification contradicted between the 2020 monitoring report (quantified) and the 2023 monitoring report (deemed negligible), with a 0% deduction applied
  • Low extraction confidence across the document set, meaning key figures may not have been reliably captured

Credit Vintages

IssuedRetiredAvailable
2015
1091090
2016
5,2185,14969
2017
7,7157,70411
2018
6,6956,562133
2019
6,1186,1180
2020
5,3475,245102
2021
3,5603,48971
2022
2,2682,22345
Total37,03036,599431

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

low inherent risk for efficiency project

Leakage

0% deduction, justification contradicted across reports

Baseline

Project-specific, no reassessment date recorded

Safeguards

Grievance mechanism and benefit sharing present; FPIC not confirmed

Double-claim

CCP and CORSIA status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents