Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS4424 VPA3 African Cookstoves and Water Programme

GS-993 ↗ · current registry ID: GS5635

#1150of 1329 in Industrial#112of 139 in Rwanda#1604of 1801 in Gold Standard (GS)

4.0/ 10
Integrity
4.0
Transparency
4.5
Claim Safety
3.5
Documentation
4.0

Audit Analysis

A Gold Standard cookstove project in Rwanda with VVB-confirmed additionality and a verified ERR that exceeds the pro-rata expectation for the monitoring period. However, a large gap between the PDD's assumed 99% usage rate and the 52.74% verified rate, seven material findings in the verification report, and a direct contradiction between the monitoring report and verification report on the verified usage rate (83% vs 52.74%) raise significant data-reliability and over-crediting concerns.

Red Flags

  • Verified usage rate of 52.74% (verification report, 2023) is less than half the 99% assumed in the PDD, indicating the ex-ante estimate was built on an unrealistically high adoption assumption.
  • Direct contradiction between the monitoring report (2022) reporting a verified usage rate of 0.83 (83%) and the verification report (2023) reporting 52.74% — a 30-percentage-point gap that undermines confidence in the MRV chain.
  • Seven material findings in the verification report, including inconsistent stove counts across MR sections, an outdated tracking document used for random sampling, and a missing definition of 'use' vs 'non-use' in the PDD.
  • Low extraction confidence across the document set, meaning at least one key document was poorly readable and some facts may be incomplete.

Credit Vintages

IssuedRetiredAvailable
2015
1131130
2016
5,2265,18640
2017
7,7287,71711
2018
6,7066,572134
2019
6,1286,007121
2020
5,3445,238106
2021
3,5473,52423
2022
2,2602,21545
Total37,05236,572480

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, deemed negligible; earlier MR said quantified

Baseline

Project-specific baseline; reassessment timing not stated

Safeguards

Grievance mechanism and benefit-sharing present; FPIC not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents