Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS5047 VPA34 African Improved Cookstoves and Clean Water Programme: Nyungwe Rainforest Cookstove Project II

GS-1621 ↗ · current registry ID: GS7449

#709of 1329 in Industrial#51of 139 in Rwanda#1061of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.5
Transparency
4.8
Claim Safety
5.2
Documentation
4.8

Audit Analysis

A Gold Standard cookstove project in Rwanda with VVB-confirmed additionality and a consistent usage rate, but undermined by the absence of a buffer pool despite documented stove breakage, a project-specific baseline with no reassessment record, and numerous data inconsistencies that required corrective actions. The project is functional but carries moderate permanence and data-reliability risks.

Red Flags

  • Thirteen material findings were logged in the verification report, including inconsistent stove counts, monitoring-period date errors, and a survey methodology error (wrong TDR applied to Age Group 1), all requiring corrective action
  • FPIC was not conducted (stated as false in the extracted record), which is a significant safeguards gap for a community cookstove deployment in Rwanda
  • No lifetime ex-ante ERR estimate was found in the extracted record, preventing a pro-rata over- or under-delivery check against the 82,175 tCO₂e claimed figure

Credit Vintages

IssuedRetiredAvailable
2019
8278270
2020
4,5524,49953
2021
9,3828,967415
2022
8,8656,4722,393
2023
8,7793,5715,208
2024
8,01308,013
Total40,41824,33616,082

Risk Indicators

Additionality

Combined test, VVB-confirmed (2023)

Permanence

9 stoves broken, 1; 65% breakage

Leakage

0% deemed negligible; contradictory justifications

Baseline

Project-specific; no reassessment date found

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents