GS5047 VPA39 African Improved Cookstoves and Clean Water Programme: Nyungwe Rainforest Cookstove Project VII
GS-1628 ↗ · current registry ID: GS7454
#543of 1329 in Industrial#35of 139 in Rwanda#841of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Rwanda with a combined additionality test and no reported reversal events, but the verification report identified nine material findings including broken stoves, data inconsistencies in stove counts, and a crediting-period mismatch. The project relies on a project-specific baseline and a 0% leakage deduction justified only as 'deemed negligible,' with no buffer pool or lifetime ex-ante ERR figure available to benchmark delivery. Corrective actions are in progress but the volume of findings and the CDM-form origin of the PDD raise moderate concerns about data reliability.
Red Flags
- Nine material findings in the verification report, including 9 stoves reported non-operational and a 1.65% broken-stove rate in the usage survey, undermining the 100% working-time claim
- No lifetime ex-ante ERR figure available; the claimed and verified ERR are identical (81,129), making it impossible to assess over- or under-delivery against a pro-rata expectation
- Leakage treatment contradicts itself across two monitoring reports (one says 'quantified,' the other 'deemed negligible'), and the 0% deduction rests on a thin justification
- The PDD is a CDM Programme of Activities design form (F-CDM-PoA-DD v03.0), suggesting the documentation was adapted from a CDM template rather than prepared natively for Gold Standard
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 65 | 65 | 0 | |
| 2021 | 5,823 | 5,809 | 14 | |
| 2022 | 8,702 | 8,528 | 174 | |
| 2023 | 8,653 | 3,505 | 5,148 | |
| 2024 | 8,683 | 0 | 8,683 | |
| Total | 31,926 | 17,907 | 14,019 |
Risk Indicators
Combined test applied but VVB confirmation not explicitly recorded
9 stoves non-operational
0% deduction, 'deemed negligible' justification, contradictory MRs
Project-specific baseline; reassessment timing not stated
Grievance mechanism and benefit sharing confirmed in VR; FPIC not stated
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →