Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS5047 VPA39 African Improved Cookstoves and Clean Water Programme: Nyungwe Rainforest Cookstove Project VII

GS-1628 ↗ · current registry ID: GS7454

#543of 1329 in Industrial#35of 139 in Rwanda#841of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

A Gold Standard cookstove project in Rwanda with a combined additionality test and no reported reversal events, but the verification report identified nine material findings including broken stoves, data inconsistencies in stove counts, and a crediting-period mismatch. The project relies on a project-specific baseline and a 0% leakage deduction justified only as 'deemed negligible,' with no buffer pool or lifetime ex-ante ERR figure available to benchmark delivery. Corrective actions are in progress but the volume of findings and the CDM-form origin of the PDD raise moderate concerns about data reliability.

Red Flags

  • Nine material findings in the verification report, including 9 stoves reported non-operational and a 1.65% broken-stove rate in the usage survey, undermining the 100% working-time claim
  • No lifetime ex-ante ERR figure available; the claimed and verified ERR are identical (81,129), making it impossible to assess over- or under-delivery against a pro-rata expectation
  • Leakage treatment contradicts itself across two monitoring reports (one says 'quantified,' the other 'deemed negligible'), and the 0% deduction rests on a thin justification
  • The PDD is a CDM Programme of Activities design form (F-CDM-PoA-DD v03.0), suggesting the documentation was adapted from a CDM template rather than prepared natively for Gold Standard

Credit Vintages

IssuedRetiredAvailable
2020
65650
2021
5,8235,80914
2022
8,7028,528174
2023
8,6533,5055,148
2024
8,68308,683
Total31,92617,90714,019

Risk Indicators

Additionality

Combined test applied but VVB confirmation not explicitly recorded

Permanence

9 stoves non-operational

Leakage

0% deduction, 'deemed negligible' justification, contradictory MRs

Baseline

Project-specific baseline; reassessment timing not stated

Safeguards

Grievance mechanism and benefit sharing confirmed in VR; FPIC not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents