Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS5047 VPA61 African Improved Cookstoves and Clean Water Programme: Ibanda – Makera Forest Cook Stove Project VI

GS-2951 ↗ · current registry ID: GS10992

#91of 1329 in Industrial#8of 139 in Rwanda#195of 1801 in Gold Standard (GS)

5.9/ 10
Integrity
5.8
Transparency
6.0
Claim Safety
6.2
Documentation
5.5

Audit Analysis

A Gold Standard cookstove project in Rwanda with a combined additionality test and SustainCERT verification, but significant data contradictions across documents (ERR figures, FNRB values, safeguards status) and a project-specific baseline with no documented reassessment. The verification report applies conservative values (lower ERR, lower FNRB), which mitigates over-crediting risk, but the absence of a buffer pool, ex-ante lifetime ERR figure, and explicit VVB additionality confirmation leaves moderate uncertainty on permanence and additionality robustness.

Red Flags

  • Six contradictions between the verification report, monitoring report, and PDD on key parameters (ERR, FNRB, safeguards, grievance mechanism, crediting period, leakage justification) indicate inconsistent record-keeping
  • No buffer pool percentage stated and no reversal events data available, leaving permanence risk unquantified for a 9-year crediting period
  • Baseline is project-specific with no documented reassessment date, and the PDD crediting period (2021-07-01, end date missing) conflicts with the monitoring report (2020-10-13 to 2029-09-01)
  • No ex-ante lifetime ERR figure found in any document, preventing a pro-rata delivery check against the 58,350 tCO2e verified for the 13-month monitoring period

Credit Vintages

IssuedRetiredAvailable
2022
7,2037,2030
2023
73872414
Total7,9417,92714

Risk Indicators

Additionality

Combined test applied but VVB confirmation not explicitly recorded

Permanence

no reversal data; 9-year crediting period

Leakage

0% deduction, 'deemed negligible' justification; contradiction in records

Baseline

Project-specific baseline; no reassessment date documented

Safeguards

Grievance mechanism and benefit sharing confirmed in verification report; FPIC not stated

Double-claim

CORSIA and CCP status both unstated; dual-channel risk unassessed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents