GS5047 VPA62 African Improved Cookstoves and Clean Water Programme: Ibanda – Makera Forest Cook Stove Project VII
GS-2952 ↗ · current registry ID: GS10993
#912of 1329 in Industrial#82of 139 in Rwanda#1330of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Rwanda with a named VVB and a combined additionality test, but undermined by six inter-document contradictions (notably in ERR figures and fNRB values), 13 outstanding corrective actions, a project-specific baseline with no recorded reassessment, and no buffer pool or permanence mechanism documented. The project's claims are not yet robustly supported by the available evidence.
Red Flags
- 13 corrective actions remain open, including errors in installation dates, crediting period misalignment, missing baseline parameters (Nb,y and Pb,y), and a usage rate transferred incorrectly from a US calculation sheet
- ERR contradiction: the verification report states 233,534 tCO₂e while the monitoring report states 16,666 tCO₂e for the same period — a 14× discrepancy
- fNRB contradiction: 0.98 in the verification report versus 0.77 in the monitoring report, a 27% gap that materially affects baseline emissions
- Leakage treatment is contradictory: the verification report states leakage is 'deemed negligible' (0% deduction) while the monitoring report describes it as 'quantified'
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 5,965 | 5,965 | 0 | |
| 2023 | 738 | 537 | 201 | |
| Total | 6,703 | 6,502 | 201 |
Risk Indicators
Combined test present but VVB confirmation not stated
no reversal events recorded
0% deduction, 'deemed negligible' but contradicted by monitoring report
Project-specific baseline; no reassessment date recorded
Grievance mechanism present (2026); FPIC not stated; documentation inconsistent
CCP and CORSIA statuses both unstated; dual-channel risk unassessed
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →