Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS5047 VPA63 African Improved Cookstoves and Clean Water Programme: Ibanda – Makera Forest Cook Stove Project VIII

GS-2953 ↗ · current registry ID: GS10994

#261of 1329 in Industrial#23of 139 in Rwanda#437of 1801 in Gold Standard (GS)

5.4/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.0
Documentation
5.5

Audit Analysis

A Gold Standard improved cookstove project in Rwanda displacing fuelwood, verified by SustainCERT. The project has a combined additionality test and consistent usage rates, but lacks a buffer pool, relies on a project-specific baseline, and shows a 16% over-claiming discrepancy between the monitoring and verification reports. Overall a moderate-quality project with several data gaps and minor data-quality corrections.

Red Flags

  • ERR discrepancy: the monitoring report (Nov 2023) claimed 69,668 tCO₂e while the verification report (Nov 2023) confirmed only 58,350 tCO₂e — a 16% over-claim that the VVB corrected
  • Additionality VVB verification status is not explicitly confirmed in the extracted record despite a combined test being stated
  • Lifetime ex-ante ERR estimate is not available, preventing a pro-rata delivery check against the 13-month monitoring period

Credit Vintages

IssuedRetiredAvailable
2022
3,4773,4770
2023
73872414
Total4,2154,20114

Risk Indicators

Additionality

Combined test stated but VVB confirmation not explicitly recorded

Permanence

no reversal events confirmed absent

Leakage

0% deduction, 'deemed negligible' — reasonable for cookstoves but not quantified

Baseline

Project-specific baseline; no reassessment date recorded

Safeguards

Grievance mechanism and benefit sharing confirmed by VVB; FPIC not stated

Double-claim

CORSIA and CCP status both not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents