Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS5047 VPA7 African Improved Cookstoves and Clean Water Programme: Virunga Mountain Gorilla Cookstove Project Musanze

GS-1032 ↗ · current registry ID: GS5891

#316of 1329 in Industrial#24of 139 in Rwanda#514of 1801 in Gold Standard (GS)

5.3/ 10
Integrity
4.8
Transparency
5.8
Claim Safety
5.5
Documentation
5.0

Audit Analysis

The Virunga Mountain Gorilla Cookstove Project (GS5047 VPA7) is a Gold Standard improved cookstove project in Rwanda with VVB-verified additionality and a conservative FNRB of 0.98, but is undermined by the absence of FPIC, unaddressed reversal risk, a project-specific baseline, and an extensive list of material findings related to data quality and calculation errors. The project appears to be under-delivering relative to ex-ante estimates, which is conservative for claim safety, but the volume of monitoring issues and inter-document contradictions reduce confidence in the overall data integrity.

Red Flags

  • FPIC was not conducted despite the project distributing cookstoves to communities across four districts in Rwanda
  • Reversal events are explicitly 'not addressed' in the verification report, and no buffer pool percentage is stated
  • The verification report lists over 20 material findings including duplicate stove IDs, damaged stoves not flagged as non-users, incorrect non-CO2 emission factors, and miscalculated Project Technology Days
  • Actual emission reductions are reported as 'considerably below estimated values' due to lower usage rate and KPT results, indicating the ex-ante assumptions were overly optimistic
  • A contradiction exists between the verification report (44,128 tCO2e) and the monitoring report (32,609 tCO2e) for total ERR claimed

Credit Vintages

IssuedRetiredAvailable
2019
2022020
2020
3,0042,97925
2021
4,6764,65224
2022
4,1604,07882
2023
6,9736,88291
2024
5,40205,402
Total24,41718,7935,624

Risk Indicators

Additionality

VVB-verified combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, quantified justification

Baseline

Project-specific, reassessment date not stated

Safeguards

Grievance & benefit sharing present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents