GS5047 VPA80 African Improved Cookstoves and Clean Water Programme: Gishwati – Mukura Forest Conservation Project VIII
GS-2975 ↗ · current registry ID: GS11016
#626of 1329 in Industrial#44of 139 in Rwanda#953of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard improved-cookstove distribution project in Rwanda with VVB-confirmed additionality and no reversal events, but undermined by 37 outstanding corrective actions, nine cross-document contradictions (including conflicting leakage justifications and fNRB values), and a project-specific baseline with no stated reassessment date. The data-quality issues and contradictory records significantly erode confidence in the verified emission reductions.
Red Flags
- 37 corrective actions remain open in the 2026 verification report, spanning data inconsistencies, missing carbon waiver forms, sampling confidence gaps, and unaddressed stove-crack repairs — indicating systemic monitoring-report quality problems
- Leakage justification is contradictory: the 2026 verification report states 'quantified' while the 2026 monitoring report states 'deemed negligible', yet the deduction is 0% in both cases
- fNRB value has shifted across documents (0.77 in the 2020 PDD, 0.98→0.89 correction noted in material findings, 0.89 in the 2026 VR), and the method changed from 'national default' (2023 VR) to 'local field' (2026 VR), raising questions about baseline robustness
- Safeguards are confirmed in the 2026 verification report but explicitly absent in the 2026 monitoring report for the same period, creating a direct contradiction on a core Gold Standard requirement
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 3,850 | 3,850 | 0 | |
| 2023 | 9,913 | 9,715 | 198 | |
| 2024 | 10,000 | 0 | 10,000 | |
| Total | 23,763 | 13,565 | 10,198 |
Risk Indicators
VVB-confirmed combined test
stove crack reported
0% deduction with contradictory justifications across documents
Project-specific baseline; reassessment date not stated; fNRB revised multiple times
Confirmed in VR but contradicted by MR for same period
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →