Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS5047 VPA81 African Improved Cookstoves and Clean Water Programme: Gishwati – Mukura Forest Conservation Project IX

GS-2976 ↗ · current registry ID: GS11017

#92of 1329 in Industrial#9of 139 in Rwanda#196of 1801 in Gold Standard (GS)

5.9/ 10
Integrity
6.2
Transparency
5.8
Claim Safety
5.2
Documentation
6.3

Audit Analysis

A Gold Standard improved cookstove project in Rwanda with VVB-confirmed additionality and no material findings, but undermined by significant contradictions between the verification and monitoring reports on ERR figures, FNRB values, and crediting period. The project-specific baseline, absence of a stated buffer pool, and unresolved data discrepancies create moderate over-crediting and permanence risk.

Red Flags

  • ERR figure contradiction: the monitoring report contains both 63,536 and 5,850 as claimed ERR values, a ~10× discrepancy that undermines confidence in the reported reductions
  • Crediting period conflict: the verification report states 2017–2024 while the monitoring report states 2022–2030, creating ambiguity about the valid crediting window
  • FNRB value differs between documents (0.89 local field vs 0.77 national default), and the higher value was used in the verification, inflating claimed reductions

Credit Vintages

IssuedRetiredAvailable
2022
1,57701,577
2023
9,91309,913
2024
10,000010,000
Total21,490021,490

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal risk unquantified

Leakage

0% deduction, justification contradicted across documents

Baseline

Project-specific; no reassessment date stated

Safeguards

Mentioned in verification but absent from monitoring and PDD

Double-claim

CORSIA and CCP statuses not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents