Vai al contenuto principale
GS Energy Efficiency - Domestic Rwanda Documentazione completa General Methodology v2.0

GS5047 VPA82 African Improved Cookstoves and Clean Water Programme: Gishwati – Mukura Forest Conservation Project X

GS-2977 ↗

5.0 / 10
Integrity
5.8
Transparency
4.6
Claim Safety
4.9
Documentation
4.1

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the validation report reports no material findings or corrective actions.

missing Leakage treatment is not fully transparent in the extracted record, and reversal risk is marked as not addressed rather than clearly managed.

Transparency

verified The validation report identifies SustainCERT and the project documents include safeguards, FPIC, and a grievance mechanism.

missing The monitoring period, verified emission reductions, and usage verification are not stated in the extracted record, limiting MRV transparency.

Claim Safety

verified The project uses a project baseline and a quantified leakage approach is indicated in the validation report.

missing The contradictory FNRB values and missing verified usage data increase over-crediting risk and reduce confidence in the claim.

Documentation

verified Multiple evidence documents were used, including a validation report, and the extraction captured several safeguard-related fields.

missing Extraction confidence is low, and several core fields are missing or not stated, including monitoring period, buffer pool, and verified reductions.

Detailed Analysis

Integrity

The validation report from SustainCERT confirms additionality and reports no material findings or corrective actions, which supports the project’s core integrity. At the same time, leakage handling is not fully clear in the extracted record, and reversal risk is listed as not addressed, so permanence and emissions accounting confidence are only moderate. The project uses a project baseline, but the baseline was not shown to have been recently reassessed.

Transparency

Transparency is weakened by missing core MRV details: the monitoring period, total verified emission reductions, and verified usage rate are not stated in the extracted record. The validation report does identify the verifier and the project documentation includes safeguards, FPIC, and a grievance mechanism, which helps. Still, the low extraction confidence and incomplete quantitative reporting reduce overall transparency.

Claim Safety

Claim safety is mixed because the project appears to have a quantified leakage approach and a project baseline, but the evidence is incomplete. The extracted record shows a contradiction in the FNRB value, with one source indicating 77 and another indicating 0.98, and the higher-priority validation report value was privileged because it is the more recent and formal validation document. Missing verified usage data and absent claimed-versus-verified reduction figures further increase over-crediting risk.

Documentation

Documentation quality is limited by low extraction confidence and several missing or unstated fields, including buffer pool coverage, monitoring period, and verified reductions. The record does include multiple documents and a validation report dated 2020-10-13, which is reasonably recent relative to the 2022-2043 crediting period. However, the incompleteness of the extracted evidence prevents a stronger documentation score.

Overall

The project shows some credible safeguards and validation support, but the evidence base is incomplete and internally inconsistent in important places. I privileged the validation report over older or less specific sources for the leakage and FNRB contradictions because it is the formal, later validation document, but the contradictions still reduce reliability. Given the low extraction confidence and missing quantitative MRV data, the overall assessment remains only moderate.

Audit Analysis

The project has some positive quality signals, including VVB-confirmed additionality, FPIC, a grievance mechanism, and no reported material findings. However, key evidence is incomplete or inconsistent, especially around leakage, usage verification, and the FNRB value, which weakens confidence in the claimed climate benefits.

Project Description

Developer: Likano Project Development GmbH Type: Energy Efficiency - Domestic Size: Micro Scale Crediting period: 2022-11-01 → 2029-10-31 Estimated annual credits: 8802 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 13: Climate Action, Goal 3: Good Health and Well-Being

Red Flags

  • Leakage treatment is inconsistent across documents, with one source saying it was deemed negligible and the validation report saying it was quantified, but no deduction percentage is available.
  • The FNRB figure is contradictory across documents, and the extracted record does not show a verified usage rate or claimed versus verified emission reductions.

Credit Vintages

Issued Retired Available
2022
1,152 0 1,152
2023
9,913 0 9,913
Total 11,065 0 11,065

Cosa migliorerebbe questo punteggio

  • Publish the monitoring report with verified emission reductions, usage rate verification, and the exact leakage deduction applied.
  • Clarify the FNRB calculation, buffer pool treatment, and reversal management in a single consistent document set.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

reversal risk not addressed

Leakage

leakage quantified but deduction missing

Baseline

project baseline without reassessment date

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-17 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti