GS5658 VPA 29: Improved Cookstoves for Environmental Conservation in Southern Ethiopia
GS-2829 ↗ · current registry ID: GS10872
#1269of 1329 in Industrial#32of 36 in Ethiopia#1738of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard cookstove project in Ethiopia presents serious integrity concerns: the most recent verification report (2025) indicates additionality was not confirmed by the VVB and that FPIC was not conducted, directly contradicting earlier documents. The project carries 28 outstanding corrective actions and 19 material findings, reflecting significant MRV and documentation deficiencies. While leakage is now quantified at 5% and no reversal events are reported, the absence of an ex-ante lifetime estimate, a project-specific baseline, and a buffer pool leaves the credit's robustness substantially unverified.
Red Flags
- Additionality was NOT verified by the VVB in the 2025 verification report, contradicting the 2023 report which confirmed it — the most recent and authoritative document is privileged
- FPIC was NOT conducted per the 2025 verification report, contradicting the 2017 PDD which stated it was done — a critical safeguard gap for a community cookstove project in Ethiopia
- 28 corrective actions and 19 material findings remain open, including inconsistent stove counts, missing survey formulas, and unverified sample representativeness across three VPAs
- No ex-ante lifetime emission reduction estimate is available in any document, making over-crediting assessment impossible
- Internal inconsistency within the same monitoring report: total ERR claimed appears as both 20,008 and 6,112 tCO2e
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 6,486 | 6,486 | 0 | |
| 2021 | 9,717 | 9,717 | 0 | |
| 2022 | 9,308 | 8,672 | 636 | |
| 2023 | 5,477 | 0 | 5,477 | |
| Total | 30,988 | 24,875 | 6,113 |
Risk Indicators
Not VVB-verified (2025 report)
no reversals (efficiency project)
5% quantified deduction (2025)
Project-specific; no reassessment date
FPIC not conducted (2025); CIGM present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →